The Impact of Shuangjiangkou Hydropower Station on the Joint Dispatch of Power Generation and Navigation for Downstream Cascade Reservoirs
In this study, the Minjiang River Basin is selected as the research object, and the construction and operation of Shuangjiangkou Hydropower Station is taken as the time division basis, the SWAT hydrological model and the joint operation model of reservoir groups are constructed, and the impact of Sh...
Saved in:
Main Authors: | YANG Yi, XU Wei, XIE Zaichao, LI Xiaojie, WANG Sufan |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2024-09-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2024.09.007 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Review on the Method of Compensation Benefit Allocation for Cascade Hydropower Stations
by: LI Yinghai, et al.
Published: (2020-01-01) -
Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy
by: LI Chonghao, et al.
Published: (2023-01-01) -
Analysis of Power Generation Potential of Kaidu River Cascade Hydropower Stations Based on Simulation-Optimization Dispatching Framework
by: CHEN Hongbo, et al.
Published: (2024-01-01) -
A Refined Short-term Scheduling Method Considering the Difference of Peak-shaving Performance of Hydropower Stations
by: HUANG Kui, et al.
Published: (2024-01-01) -
Investigation and Assessment of the Influence of Cascaded Hydropower Plants on Fish Resources in the Qiuxiangjiang River
by: LIU Jie, et al.
Published: (2020-01-01)