IMPROVING THE QUALITY OF WORK ON CULVERT UNDERPASS BOX STRUCTURES USING THE LEAN SIX SIGMA METHOD

Underpass is an infrastructure built by the government below the ground level to alleviate traffic congestion in large cities. The box culvert system serves as the construction for underpasses. The selection of this system has a significant impact on quality as it will affect the quality of work. T...

Full description

Saved in:
Bibliographic Details
Main Authors: Rian Darmawan, Budi Susetyo
Format: Article
Language:English
Published: Universitas Negeri Jakarta 2025-01-01
Series:Jurnal Pensil
Subjects:
Online Access:https://journal.unj.ac.id/unj/index.php/jpensil/article/view/45230
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832575554709094400
author Rian Darmawan
Budi Susetyo
author_facet Rian Darmawan
Budi Susetyo
author_sort Rian Darmawan
collection DOAJ
description Underpass is an infrastructure built by the government below the ground level to alleviate traffic congestion in large cities. The box culvert system serves as the construction for underpasses. The selection of this system has a significant impact on quality as it will affect the quality of work. The BSD underpass project on the Serpong - Balaraja toll road (Interchance Legok Area STA 9+800) needs to improve its quality because the results of the work do not meet the required standards. The aim of this research is to determine the most influential factors in the quality of underpasses and the implementation of lean six sigma. The research utilizes the Relative Importance Index (RII) method and the Lean Six Sigma method. From the research results, it was found that the most influential factor is ensuring that every incoming material meets the desired quality standards in the quality control variable. In addition, the analysis using Lean Six Sigma in Box Culvert work resulted in a DPMO value of 6058 per one million or equivalent to 4.133 sigma with a yield of 99.39%, thus requiring evaluation through the the DMAIC method Define – Measure – Analyze – Improvement – Control) to reduce defects and improve quality.
format Article
id doaj-art-e3d8a43f054d4fba8323508985625fdb
institution Kabale University
issn 2301-8437
2623-1085
language English
publishDate 2025-01-01
publisher Universitas Negeri Jakarta
record_format Article
series Jurnal Pensil
spelling doaj-art-e3d8a43f054d4fba8323508985625fdb2025-02-01T02:58:20ZengUniversitas Negeri JakartaJurnal Pensil2301-84372623-10852025-01-0114110.21009/jpensil.v14i1.45230IMPROVING THE QUALITY OF WORK ON CULVERT UNDERPASS BOX STRUCTURES USING THE LEAN SIX SIGMA METHODRian Darmawan0Budi Susetyo1Prodi Magister Teknik Sipil, Jurusan Magister Teknik Sipil, Fakultas Teknik, Universitas Mercu Buana, Jl. Raya, Meruya Selatan, Kembangan, Jakarta Barat, Daerah Khusus Ibukota JakartaProdi Magister Teknik Sipil, Jurusan Magister Teknik Sipil, Fakultas Teknik, Universitas Mercu Buana, Jl. Raya, Meruya Selatan, Kembangan, Jakarta Barat, Daerah Khusus Ibukota Jakarta Underpass is an infrastructure built by the government below the ground level to alleviate traffic congestion in large cities. The box culvert system serves as the construction for underpasses. The selection of this system has a significant impact on quality as it will affect the quality of work. The BSD underpass project on the Serpong - Balaraja toll road (Interchance Legok Area STA 9+800) needs to improve its quality because the results of the work do not meet the required standards. The aim of this research is to determine the most influential factors in the quality of underpasses and the implementation of lean six sigma. The research utilizes the Relative Importance Index (RII) method and the Lean Six Sigma method. From the research results, it was found that the most influential factor is ensuring that every incoming material meets the desired quality standards in the quality control variable. In addition, the analysis using Lean Six Sigma in Box Culvert work resulted in a DPMO value of 6058 per one million or equivalent to 4.133 sigma with a yield of 99.39%, thus requiring evaluation through the the DMAIC method Define – Measure – Analyze – Improvement – Control) to reduce defects and improve quality. https://journal.unj.ac.id/unj/index.php/jpensil/article/view/45230Box Culvert, Lean Six Sigma, RII, Quality, Defect
spellingShingle Rian Darmawan
Budi Susetyo
IMPROVING THE QUALITY OF WORK ON CULVERT UNDERPASS BOX STRUCTURES USING THE LEAN SIX SIGMA METHOD
Jurnal Pensil
Box Culvert, Lean Six Sigma, RII, Quality, Defect
title IMPROVING THE QUALITY OF WORK ON CULVERT UNDERPASS BOX STRUCTURES USING THE LEAN SIX SIGMA METHOD
title_full IMPROVING THE QUALITY OF WORK ON CULVERT UNDERPASS BOX STRUCTURES USING THE LEAN SIX SIGMA METHOD
title_fullStr IMPROVING THE QUALITY OF WORK ON CULVERT UNDERPASS BOX STRUCTURES USING THE LEAN SIX SIGMA METHOD
title_full_unstemmed IMPROVING THE QUALITY OF WORK ON CULVERT UNDERPASS BOX STRUCTURES USING THE LEAN SIX SIGMA METHOD
title_short IMPROVING THE QUALITY OF WORK ON CULVERT UNDERPASS BOX STRUCTURES USING THE LEAN SIX SIGMA METHOD
title_sort improving the quality of work on culvert underpass box structures using the lean six sigma method
topic Box Culvert, Lean Six Sigma, RII, Quality, Defect
url https://journal.unj.ac.id/unj/index.php/jpensil/article/view/45230
work_keys_str_mv AT riandarmawan improvingthequalityofworkonculvertunderpassboxstructuresusingtheleansixsigmamethod
AT budisusetyo improvingthequalityofworkonculvertunderpassboxstructuresusingtheleansixsigmamethod