ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT
The paper deals with the time course of the bridge abutments settlement (consolidation of the subsoil) on the motorway D4 in Stupava, Slovakia. The bridge abutments are founded on an earth embankment 5.5 meters in height and a group of piles. Over 6 years of geotechnical monitoring after the constru...
Saved in:
| Main Author: | |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Czech Technical University in Prague
2018-06-01
|
| Series: | Acta Polytechnica CTU Proceedings |
| Subjects: | |
| Online Access: | https://ojs.cvut.cz/ojs/index.php/APP/article/view/4950 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1849248396449153024 |
|---|---|
| author | Luboš Hruštinec |
| author_facet | Luboš Hruštinec |
| author_sort | Luboš Hruštinec |
| collection | DOAJ |
| description | The paper deals with the time course of the bridge abutments settlement (consolidation of the subsoil) on the motorway D4 in Stupava, Slovakia. The bridge abutments are founded on an earth embankment 5.5 meters in height and a group of piles. Over 6 years of geotechnical monitoring after the construction of bridge abutments, there were measured settlements from 102 to 106 mm. The measured settlement of intermediate bridge piers was only up to 16 mm. Geotechnical calculations and analysis are focused on the comparison of the final settlements prognosis and its time course with the real measured values. |
| format | Article |
| id | doaj-art-e30eb76a3cb54db6a150a9f9976dba20 |
| institution | Kabale University |
| issn | 2336-5382 |
| language | English |
| publishDate | 2018-06-01 |
| publisher | Czech Technical University in Prague |
| record_format | Article |
| series | Acta Polytechnica CTU Proceedings |
| spelling | doaj-art-e30eb76a3cb54db6a150a9f9976dba202025-08-20T03:57:52ZengCzech Technical University in PragueActa Polytechnica CTU Proceedings2336-53822018-06-01160111710.14311/APP.2018.16.00114152ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENTLuboš Hruštinec0Slovak University of Technology, Faculty of Civil Engineering, Department of Geotechnics, Radlinského 11, 810 05 Bratislava, Slovak RepublicThe paper deals with the time course of the bridge abutments settlement (consolidation of the subsoil) on the motorway D4 in Stupava, Slovakia. The bridge abutments are founded on an earth embankment 5.5 meters in height and a group of piles. Over 6 years of geotechnical monitoring after the construction of bridge abutments, there were measured settlements from 102 to 106 mm. The measured settlement of intermediate bridge piers was only up to 16 mm. Geotechnical calculations and analysis are focused on the comparison of the final settlements prognosis and its time course with the real measured values.https://ojs.cvut.cz/ojs/index.php/APP/article/view/4950bridge abutment, geotechnical calculations, settlement, consolidation |
| spellingShingle | Luboš Hruštinec ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT Acta Polytechnica CTU Proceedings bridge abutment, geotechnical calculations, settlement, consolidation |
| title | ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT |
| title_full | ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT |
| title_fullStr | ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT |
| title_full_unstemmed | ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT |
| title_short | ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT |
| title_sort | analysis of the time course of a bridge abutments settlement |
| topic | bridge abutment, geotechnical calculations, settlement, consolidation |
| url | https://ojs.cvut.cz/ojs/index.php/APP/article/view/4950 |
| work_keys_str_mv | AT luboshrustinec analysisofthetimecourseofabridgeabutmentssettlement |