ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT

The paper deals with the time course of the bridge abutments settlement (consolidation of the subsoil) on the motorway D4 in Stupava, Slovakia. The bridge abutments are founded on an earth embankment 5.5 meters in height and a group of piles. Over 6 years of geotechnical monitoring after the constru...

Full description

Saved in:
Bibliographic Details
Main Author: Luboš Hruštinec
Format: Article
Language:English
Published: Czech Technical University in Prague 2018-06-01
Series:Acta Polytechnica CTU Proceedings
Subjects:
Online Access:https://ojs.cvut.cz/ojs/index.php/APP/article/view/4950
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849248396449153024
author Luboš Hruštinec
author_facet Luboš Hruštinec
author_sort Luboš Hruštinec
collection DOAJ
description The paper deals with the time course of the bridge abutments settlement (consolidation of the subsoil) on the motorway D4 in Stupava, Slovakia. The bridge abutments are founded on an earth embankment 5.5 meters in height and a group of piles. Over 6 years of geotechnical monitoring after the construction of bridge abutments, there were measured settlements from 102 to 106 mm. The measured settlement of intermediate bridge piers was only up to 16 mm. Geotechnical calculations and analysis are focused on the comparison of the final settlements prognosis and its time course with the real measured values.
format Article
id doaj-art-e30eb76a3cb54db6a150a9f9976dba20
institution Kabale University
issn 2336-5382
language English
publishDate 2018-06-01
publisher Czech Technical University in Prague
record_format Article
series Acta Polytechnica CTU Proceedings
spelling doaj-art-e30eb76a3cb54db6a150a9f9976dba202025-08-20T03:57:52ZengCzech Technical University in PragueActa Polytechnica CTU Proceedings2336-53822018-06-01160111710.14311/APP.2018.16.00114152ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENTLuboš Hruštinec0Slovak University of Technology, Faculty of Civil Engineering, Department of Geotechnics, Radlinského 11, 810 05 Bratislava, Slovak RepublicThe paper deals with the time course of the bridge abutments settlement (consolidation of the subsoil) on the motorway D4 in Stupava, Slovakia. The bridge abutments are founded on an earth embankment 5.5 meters in height and a group of piles. Over 6 years of geotechnical monitoring after the construction of bridge abutments, there were measured settlements from 102 to 106 mm. The measured settlement of intermediate bridge piers was only up to 16 mm. Geotechnical calculations and analysis are focused on the comparison of the final settlements prognosis and its time course with the real measured values.https://ojs.cvut.cz/ojs/index.php/APP/article/view/4950bridge abutment, geotechnical calculations, settlement, consolidation
spellingShingle Luboš Hruštinec
ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT
Acta Polytechnica CTU Proceedings
bridge abutment, geotechnical calculations, settlement, consolidation
title ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT
title_full ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT
title_fullStr ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT
title_full_unstemmed ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT
title_short ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT
title_sort analysis of the time course of a bridge abutments settlement
topic bridge abutment, geotechnical calculations, settlement, consolidation
url https://ojs.cvut.cz/ojs/index.php/APP/article/view/4950
work_keys_str_mv AT luboshrustinec analysisofthetimecourseofabridgeabutmentssettlement