Solution for Signal Interference of SDA1 Diesel-AC Locomotive
Track signal interference problem during the approval test of SDA1 diesel-AC locomotive was analyzed and studied, and withadopting measures of simulation, control optimization, grounding optimization and test verification, track signal interference problem wassolved.
Saved in:
| Main Authors: | LIU Xiao-dong, XIAO Gong-bin |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Department of Electric Drive for Locomotives
2014-01-01
|
| Series: | 机车电传动 |
| Subjects: | |
| Online Access: | http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2014.03.016 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis and Solution of Signal Compatibility for AC Diesel Locomotive
by: XIAO Gongbin
Published: (2019-01-01) -
Micro-processor Control System Design of SDA1 AC Drive Diesel Locomotive
by: ZHANG Dong-fang, et al.
Published: (2013-01-01) -
Network Communication System of SDA1 AC-driving Diesel Locomotive
by: 杨德萍, et al.
Published: (2012-01-01) -
Adhesion Utilization Control of SDA1 AC Drive Diesel Locomotive Based on Speed Radar
by: CHEN Hua-guo, et al.
Published: (2012-01-01) -
Electric Traction System and Technic Innovationof SDA1 AC Drive Diesel Locomotive
by: XIAO Gong-bin, et al.
Published: (2013-01-01)