Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization
In resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Developm...
Saved in:
Main Authors: | Junjie Chen, Shurong Tong, Hongmei Xie, Yafei Nie, Jingwen Zhang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Discrete Dynamics in Nature and Society |
Online Access: | http://dx.doi.org/10.1155/2019/2320632 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Effective Evolutionary Algorithm for Solving the Real-Resource-Constrained Scheduling Problem
by: Huu Dang Quoc, et al.
Published: (2020-01-01) -
Probability Mechanism Based Particle Swarm Optimization Algorithm and Its Application in Resource-Constrained Project Scheduling Problems
by: Shuai Li, et al.
Published: (2019-01-01) -
Postprocessing Variationally Scheduled Quantum Algorithm for Constrained Combinatorial Optimization Problems
by: Tatsuhiko Shirai, et al.
Published: (2024-01-01) -
An Effective Hybrid Algorithm Based on Particle Swarm Optimization with Migration Method for Solving the Multiskill Resource-Constrained Project Scheduling Problem
by: Huu Dang Quoc, et al.
Published: (2022-01-01) -
Simulation of Enterprise Human Resource Scheduling Algorithm Optimization in the Context of Smart City
by: Liqun Zhang, et al.
Published: (2020-01-01)