An Irregular Flight Scheduling Model and Algorithm under the Uncertainty Theory
The flight scheduling is a real-time optimization problem. Whenever the schedule is disrupted, it will not only cause inconvenience to passenger, but also bring about a large amount of operational losses to airlines. Especially in case an irregular flight happens, the event is unanticipated frequen...
Saved in:
| Main Authors: | Deyi Mou, Wanlin Zhao |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2013-01-01
|
| Series: | Journal of Applied Mathematics |
| Online Access: | http://dx.doi.org/10.1155/2013/361926 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
THE PROBLEM OF THE RIGHT OF IRREGULAR FLIGHTS
by: A. E. Rau, et al.
Published: (2016-11-01) -
Optimization of Flight Scheduling in Urban Air Mobility Considering Spatiotemporal Uncertainties
by: Lingzhong Meng, et al.
Published: (2025-05-01) -
Research on Irregular Flight Recovery Based on Air-Rail Spatiotemporal Network Model
by: Lili Zu, et al.
Published: (2024-01-01) -
Strong stability algorithm for solving boundary problems in the irregular waveguide theory
by: A. A. Kurayev, et al.
Published: (2019-06-01) -
Application of Levy flight-based harmony search algorithm for the flexible job shop scheduling
by: Jun Li, et al.
Published: (2025-05-01)