Scheme Design of Linkage Between Staff Protection Key Switch in Fully Automatic Operation Signal System and Access Control System

On the rail transit lines designed for fully automatic operation (FAO), it is necessary to set up staff protection key switches (SPKS) in its signal system, to ensure the safety of personnel entering the automatic operation range. This paper first introduces the principles and methods of dividing pr...

Full description

Saved in:
Bibliographic Details
Main Author: LI Yong
Format: Article
Language:zho
Published: Editorial Office of Control and Information Technology 2023-06-01
Series:Kongzhi Yu Xinxi Jishu
Subjects:
Online Access:http://ctet.csrzic.com/thesisDetails#10.13889/j.issn.2096-5427.2023.03.014
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849224988456910848
author LI Yong
author_facet LI Yong
author_sort LI Yong
collection DOAJ
description On the rail transit lines designed for fully automatic operation (FAO), it is necessary to set up staff protection key switches (SPKS) in its signal system, to ensure the safety of personnel entering the automatic operation range. This paper first introduces the principles and methods of dividing protection areas respectively along the main line and at depots, and analyzes the SPKS-related operational process. In view of the safety loopholes that operators could enter the operation zone within the automatic operation range just by swiping the access control card given to them, it proposes a staff protection approach, which introduces a linkage function between SPKS and access control system (ACS) in the interlocking system, and presents designs for the interface circuit between SPKS and ACS, respectively under two types of interlocking systems: full-electronic interlocking and traditional computer-based interlocking. This approach aims to effectively avoid the potential safety risk that could arise due to operators straying into the unprotected zone of the automatic operation range.
format Article
id doaj-art-dd96519b1dd445ac802eec72978fbd3c
institution Kabale University
issn 2096-5427
language zho
publishDate 2023-06-01
publisher Editorial Office of Control and Information Technology
record_format Article
series Kongzhi Yu Xinxi Jishu
spelling doaj-art-dd96519b1dd445ac802eec72978fbd3c2025-08-25T06:48:24ZzhoEditorial Office of Control and Information TechnologyKongzhi Yu Xinxi Jishu2096-54272023-06-0110210839334553Scheme Design of Linkage Between Staff Protection Key Switch in Fully Automatic Operation Signal System and Access Control SystemLI YongOn the rail transit lines designed for fully automatic operation (FAO), it is necessary to set up staff protection key switches (SPKS) in its signal system, to ensure the safety of personnel entering the automatic operation range. This paper first introduces the principles and methods of dividing protection areas respectively along the main line and at depots, and analyzes the SPKS-related operational process. In view of the safety loopholes that operators could enter the operation zone within the automatic operation range just by swiping the access control card given to them, it proposes a staff protection approach, which introduces a linkage function between SPKS and access control system (ACS) in the interlocking system, and presents designs for the interface circuit between SPKS and ACS, respectively under two types of interlocking systems: full-electronic interlocking and traditional computer-based interlocking. This approach aims to effectively avoid the potential safety risk that could arise due to operators straying into the unprotected zone of the automatic operation range.http://ctet.csrzic.com/thesisDetails#10.13889/j.issn.2096-5427.2023.03.014urban rail transitstaff protection key switch(SPKS)fully automatic operation(FAO)signal systeminterlocking systemaccess control system (ACS)
spellingShingle LI Yong
Scheme Design of Linkage Between Staff Protection Key Switch in Fully Automatic Operation Signal System and Access Control System
Kongzhi Yu Xinxi Jishu
urban rail transit
staff protection key switch(SPKS)
fully automatic operation(FAO)
signal system
interlocking system
access control system (ACS)
title Scheme Design of Linkage Between Staff Protection Key Switch in Fully Automatic Operation Signal System and Access Control System
title_full Scheme Design of Linkage Between Staff Protection Key Switch in Fully Automatic Operation Signal System and Access Control System
title_fullStr Scheme Design of Linkage Between Staff Protection Key Switch in Fully Automatic Operation Signal System and Access Control System
title_full_unstemmed Scheme Design of Linkage Between Staff Protection Key Switch in Fully Automatic Operation Signal System and Access Control System
title_short Scheme Design of Linkage Between Staff Protection Key Switch in Fully Automatic Operation Signal System and Access Control System
title_sort scheme design of linkage between staff protection key switch in fully automatic operation signal system and access control system
topic urban rail transit
staff protection key switch(SPKS)
fully automatic operation(FAO)
signal system
interlocking system
access control system (ACS)
url http://ctet.csrzic.com/thesisDetails#10.13889/j.issn.2096-5427.2023.03.014
work_keys_str_mv AT liyong schemedesignoflinkagebetweenstaffprotectionkeyswitchinfullyautomaticoperationsignalsystemandaccesscontrolsystem