Train Network Control System and Its Fault Diagnosis of Guangzhou Metro Line 3
Taking Guangzhou metro line 3 as an example, train network control system and its diagnosis were analyzed. Based on the Guangzhou metro line 3 train network control system troubleshooting and analysis, higher requirements of the train network control system stability was put forward.
Saved in:
| Main Author: | HUANGWen-can |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Department of Electric Drive for Locomotives
2012-01-01
|
| Series: | 机车电传动 |
| Subjects: | |
| Online Access: | http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2012.06.027 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Cause Analysis of Slight Fault of MVB Bus in Guangzhou Metro Line 7
by: Peiyang LIN, et al.
Published: (2019-01-01) -
Typical Faults Analysis and Troubleshooting of a MetroTrain MVB Communication Network Control System
by: Zhengwei HU, et al.
Published: (2019-07-01) -
Research and Design of Vehicle Control Unit (VCU) Based on TCN
by: 肖家博, et al.
Published: (2010-01-01) -
Linear Motor Vehicle Technology of Guangzhou Metro 6th Line and Difference from 4th & 5th Line Vehicle
by: 游高祥
Published: (2012-01-01) -
Speed Control Logic Analysis of Domestic Traction Trains and Siemens Trains in Northern-extension Section of Guangzhou Metro Line 3
by: HE Wenle, et al.
Published: (2016-01-01)