A Dynamic Just-in-Time Component Delivery Framework for Off-Site Construction
Off-site construction entails various advantages compared with the traditional construction method; however, the fragmentation of the prefabrication and assembly results in a complex supply chain. Both general contractors and factories often encounter production deviation, making the original compon...
Saved in:
| Main Authors: | Tongguang Si, Hong Xian Li, Zhen Lei, Hexu Liu, SangHyeok Han |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2021-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2021/9953732 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Building Information Modelling- (BIM-) Based Generative Design for Drywall Installation Planning in Prefabricated Construction
by: Jose Daniel Cuellar Lobo, et al.
Published: (2021-01-01) -
Contractor Perceptions of Off-Site Modular Construction in Kuwait: An Investigation of Current Practices
by: Areej AlBanwan, et al.
Published: (2024-08-01) -
Proactive Production Scheduling Approach for Off-Site Construction with Due Date Uncertainty
by: Taehoon Kim, et al.
Published: (2024-11-01) -
Data-Driven Analysis of Construction Safety Dynamics: Regulatory Frameworks, Evolutionary Patterns, and Technological Innovations
by: Hosam Olimat, et al.
Published: (2025-05-01) -
Digital Twins and AI Decision Models: Advancing Cost Modelling in Off-Site Construction
by: Joas Serugga
Published: (2025-01-01)