Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China
To determine the layout parameters of the gas drainage roadway (GDR) serving for the working face, an analytical calculation method of fracture zone and the modelling experiment were adopted, and the overburden fissure induced by mining and the height of fracture zone were analyzed. For the research...
Saved in:
Main Authors: | Zhiliu Wang, Bo Liu, Yanhui Han, Zhaoyang Li, Yingjie Cao, Fuzhou Qi |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/3007807 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Numerical Optimization of Drilling Parameters for Gas Predrainage and Excavating-Drainage Collaboration on Roadway Head
by: Mingkun Luo, et al.
Published: (2022-01-01) -
Stability Control Mechanism of High-Stress Roadway Surrounding Rock by Roof Fracturing and Rock Mass Filling
by: Fuzhou Qi, et al.
Published: (2021-01-01) -
Numerical Analysis of the Width Design of a Protective Pillar in High-Stress Roadway: A Case Study
by: FuZhou Qi, et al.
Published: (2021-01-01) -
Stability of a Roadway below a Coal Seam under Dynamic Pressure: A Case Study of the 11123 Floor Gas Drainage Roadway of a Mine in Huainan, China
by: Pingsong Zhang, et al.
Published: (2020-01-01) -
Study on Key Parameters of Directional Long Borehole Layout in High-Gas Working Face
by: Zhenguo Yan, et al.
Published: (2021-01-01)