Linear Control Method for Arch Ring of Oblique-Stayed Buckle Cantilever Pouring Reinforced Concrete Arch Bridge
Yelang Lake Bridge is the largest cantilevered single-chamber reinforced concrete arch bridge in China, with a net span of 210 m. In this article, an equation for positioning the height of the formwork before pouring of the arch ring segment was derived, which was suitable for the construction contr...
Saved in:
Main Authors: | Zengwu Liu, Jianting Zhou, Yuexing Wu, Xing You, Yinghao Qu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/6633717 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Discussion on Application of Cardioid to Horizontal Arch Ring of Arch Dam
by: ZHOU Bin
Published: (2020-01-01) -
Study on the Cracking Mechanism of Arch Foot of CFST Tied Arch Bridge Based on Multiscale Numerical Simulation
by: Zeying Yang, et al.
Published: (2022-01-01) -
Wind-Induced Response Analysis for a Fatigue-Prone Asymmetric Steel Arch Bridge with Inclined Arch Ribs
by: You-Hua Su, et al.
Published: (2022-01-01) -
Study and Renovation of Historical Masonry Arch Bridge
by: Andris Paeglītis, et al.
Published: (2013-03-01) -
Train-Bridge Dynamic Behaviour of Long-Span Asymmetrical-Stiffness Cable-Stayed Bridge
by: Yuexing Wu, et al.
Published: (2021-01-01)