Linear Control Method for Arch Ring of Oblique-Stayed Buckle Cantilever Pouring Reinforced Concrete Arch Bridge

Yelang Lake Bridge is the largest cantilevered single-chamber reinforced concrete arch bridge in China, with a net span of 210 m. In this article, an equation for positioning the height of the formwork before pouring of the arch ring segment was derived, which was suitable for the construction contr...

Full description

Saved in:
Bibliographic Details
Main Authors: Zengwu Liu, Jianting Zhou, Yuexing Wu, Xing You, Yinghao Qu
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/6633717
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832555014042681344
author Zengwu Liu
Jianting Zhou
Yuexing Wu
Xing You
Yinghao Qu
author_facet Zengwu Liu
Jianting Zhou
Yuexing Wu
Xing You
Yinghao Qu
author_sort Zengwu Liu
collection DOAJ
description Yelang Lake Bridge is the largest cantilevered single-chamber reinforced concrete arch bridge in China, with a net span of 210 m. In this article, an equation for positioning the height of the formwork before pouring of the arch ring segment was derived, which was suitable for the construction control of the long-span reinforced concrete arch bridge such as the Yelang Lake Bridge. The arch ring segment elevation calculation equation was derived under the two typical working conditions that the concrete pouring of the arch ring segment is completed and the buckle cable and anchor cable tensioning are completed. In addition, two typical working conditions of arch ring segment concrete pouring and cable tensioning were evaluated. Then, a new type of cradle and loading test of the cradle, which meet the requirements of the long segment pouring of the arch ring, were introduced. Finally, the measurement deviation during the construction of the arch segment was analyzed. The linear control results of the arch ring showed that the arch ring segment elevation calculation formula could effectively ensure the accuracy of the arch ring segment construction process under the two typical conditions of completion of concrete pouring of the arch ring segment and completion of the buckle and anchor cable tensioning. The maximum deviation is only 3.1 mm. The line shape after the completion of the arch ring construction was in good agreement with the target line shape, and the deviation between the measured value and the target value was only 2.5 cm, which met the engineering requirements.
format Article
id doaj-art-db1f4e7112f54e81a97ee6e6fdffe547
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-db1f4e7112f54e81a97ee6e6fdffe5472025-02-03T05:49:50ZengWileyAdvances in Civil Engineering1687-80861687-80942021-01-01202110.1155/2021/66337176633717Linear Control Method for Arch Ring of Oblique-Stayed Buckle Cantilever Pouring Reinforced Concrete Arch BridgeZengwu Liu0Jianting Zhou1Yuexing Wu2Xing You3Yinghao Qu4State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaState Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaState Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaState Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaState Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaYelang Lake Bridge is the largest cantilevered single-chamber reinforced concrete arch bridge in China, with a net span of 210 m. In this article, an equation for positioning the height of the formwork before pouring of the arch ring segment was derived, which was suitable for the construction control of the long-span reinforced concrete arch bridge such as the Yelang Lake Bridge. The arch ring segment elevation calculation equation was derived under the two typical working conditions that the concrete pouring of the arch ring segment is completed and the buckle cable and anchor cable tensioning are completed. In addition, two typical working conditions of arch ring segment concrete pouring and cable tensioning were evaluated. Then, a new type of cradle and loading test of the cradle, which meet the requirements of the long segment pouring of the arch ring, were introduced. Finally, the measurement deviation during the construction of the arch segment was analyzed. The linear control results of the arch ring showed that the arch ring segment elevation calculation formula could effectively ensure the accuracy of the arch ring segment construction process under the two typical conditions of completion of concrete pouring of the arch ring segment and completion of the buckle and anchor cable tensioning. The maximum deviation is only 3.1 mm. The line shape after the completion of the arch ring construction was in good agreement with the target line shape, and the deviation between the measured value and the target value was only 2.5 cm, which met the engineering requirements.http://dx.doi.org/10.1155/2021/6633717
spellingShingle Zengwu Liu
Jianting Zhou
Yuexing Wu
Xing You
Yinghao Qu
Linear Control Method for Arch Ring of Oblique-Stayed Buckle Cantilever Pouring Reinforced Concrete Arch Bridge
Advances in Civil Engineering
title Linear Control Method for Arch Ring of Oblique-Stayed Buckle Cantilever Pouring Reinforced Concrete Arch Bridge
title_full Linear Control Method for Arch Ring of Oblique-Stayed Buckle Cantilever Pouring Reinforced Concrete Arch Bridge
title_fullStr Linear Control Method for Arch Ring of Oblique-Stayed Buckle Cantilever Pouring Reinforced Concrete Arch Bridge
title_full_unstemmed Linear Control Method for Arch Ring of Oblique-Stayed Buckle Cantilever Pouring Reinforced Concrete Arch Bridge
title_short Linear Control Method for Arch Ring of Oblique-Stayed Buckle Cantilever Pouring Reinforced Concrete Arch Bridge
title_sort linear control method for arch ring of oblique stayed buckle cantilever pouring reinforced concrete arch bridge
url http://dx.doi.org/10.1155/2021/6633717
work_keys_str_mv AT zengwuliu linearcontrolmethodforarchringofobliquestayedbucklecantileverpouringreinforcedconcretearchbridge
AT jiantingzhou linearcontrolmethodforarchringofobliquestayedbucklecantileverpouringreinforcedconcretearchbridge
AT yuexingwu linearcontrolmethodforarchringofobliquestayedbucklecantileverpouringreinforcedconcretearchbridge
AT xingyou linearcontrolmethodforarchringofobliquestayedbucklecantileverpouringreinforcedconcretearchbridge
AT yinghaoqu linearcontrolmethodforarchringofobliquestayedbucklecantileverpouringreinforcedconcretearchbridge