Robust Multi-Stage Planning of Park-Level Integrated Energy System Considering Source-Load Uncertainties
[Objective] A robust multi-stage planning model is established for a park-level integrated energy system (PIES) to minimize the total life-cycle present-value cost while considering source-load uncertainties, optimal construction sequencing, and tiered carbon trading to enhance economic efficiency a...
Saved in:
| Main Author: | JIANG Xunpu, BAO Zhejing, YU Miao, GUO Chuangxin, GUO Yuanyue, WANG Jian |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Department of Electric Power Construction
2025-04-01
|
| Series: | Dianli jianshe |
| Subjects: | |
| Online Access: | https://www.cepc.com.cn/fileup/1000-7229/PDF/1743057868101-1704610493.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Multi‐objective and multi‐stage low‐carbon planning of park integrated energy system considering random outages from superior power grid
by: Xunpu Jiang, et al.
Published: (2024-11-01) -
Flexible scheduling strategy for power systems considering source-load uncertainty
by: Qunmin YAN, et al.
Published: (2025-03-01) -
Credibility Copula-Based Robust Multistage Plan for Industrial Parks Under Exogenous and Endogenous Uncertainties
by: Zehao Shi, et al.
Published: (2025-01-01) -
Multi-Objective Robustness of Integrated Energy System Considering Source-Load Uncertainty
by: LI Jianlin, ZHANG Zedong, LIANG Ce, ZENG Fei
Published: (2025-02-01) -
Optimization of Energy Use for Zero-Carbon Buildings Considering Intraday Source-Load Uncertainties
by: Guiqing Feng, et al.
Published: (2025-05-01)