Calculation of Soil Deformation Caused by Shield Tunneling through the Sludge Layer with Plastic Drainage Plates
Due to a lack of engineering experience, research on ground deformation during shield machine tunneling in sludge layers is limited, especially in areas with plastic drainage plates installed for ground stabilization. When the shield passes through this area, the shield cutterhead may be jammed by t...
Saved in:
Main Authors: | Fan Zhang, Linchong Huang, Yu Liang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/6625132 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Monitoring System for Circular Deformation in Metro Shield Tunnels in Soft Soils
by: Jinfeng Zhang, et al.
Published: (2020-01-01) -
Analysis of Shear Stagger Deformation of Existing Shield Tunnel below Induced by Quasirectangular Shield Tunneling
by: Kun Zhang, et al.
Published: (2023-01-01) -
Risk Analysis and Control Measures for Slurry Shield Tunneling Diagonally under an Urban River Embankment
by: Yu Liang, et al.
Published: (2020-01-01) -
Deformation and Reinforcement of the Existing Tunnel Affected by New Shield Tunnel Construction with Small Clearance
by: Junchao Zhang, et al.
Published: (2025-01-01) -
A Displacement-Based Theory for Predicting the Support Force on the Shield Tunneling Surface in Sandy Soil Layers
by: Guang Sun, et al.
Published: (2021-01-01)