Model Penentuan Ukuran Batch Produksi dan Bufferstock untuk Sistem Produksi Mengalami Penurunan Kinerja dengan Mempertimbangkan Perubahan Order Awal

This study develops a model that involves information the preliminary order. At first, the manufacturer provides the preliminary order for the coming week (five days) varies from day to day and is received on Friday. Change in the preliminary order for a given day is announced one day before and th...

Full description

Saved in:
Bibliographic Details
Main Author: Ivan D Wangsa
Format: Article
Language:English
Published: Universitas Andalas 2016-04-01
Series:Jurnal Optimasi Sistem Industri
Subjects:
Online Access:https://josi.ft.unand.ac.id/index.php/josi/article/view/259
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850228098985885696
author Ivan D Wangsa
author_facet Ivan D Wangsa
author_sort Ivan D Wangsa
collection DOAJ
description This study develops a model that involves information the preliminary order. At first, the manufacturer provides the preliminary order for the coming week (five days) varies from day to day and is received on Friday. Change in the preliminary order for a given day is announced one day before and this is viewed as it occurs randomly. Moreover, production systems experience performance degradation (deterioration). Status of the production process shifts from in control to out of control that is identified by the last inspection. Inspection is done by sampling. At the time of the status of out of control the probability of producing non-conforming system component that is charged to the restoration cost and warranty costs.This paper is looking for a solution for determining the production batch size and the buffer stock to reduce total cost. The decision variables are production run period (T) and buffer factor (m). Having obtained the variables T and m, then the variable production batch size (QT) and the buffer stock (BT) can be determined sequentially. Heuristic methods used are Silver-Meal (SM) and Least Unit Cost (LUC) to obtain a solution for each model. Numerical examples are given to demonstrate the performance of the models. From the numerical results, it appears that LUC method is better than SM method.
format Article
id doaj-art-d7b58d6ae72146948030d4d1a3d3a19d
institution OA Journals
issn 2088-4842
2442-8795
language English
publishDate 2016-04-01
publisher Universitas Andalas
record_format Article
series Jurnal Optimasi Sistem Industri
spelling doaj-art-d7b58d6ae72146948030d4d1a3d3a19d2025-08-20T02:04:37ZengUniversitas AndalasJurnal Optimasi Sistem Industri2088-48422442-87952016-04-0114210.25077/josi.v14.n2.p279-291.2015Model Penentuan Ukuran Batch Produksi dan Bufferstock untuk Sistem Produksi Mengalami Penurunan Kinerja dengan Mempertimbangkan Perubahan Order AwalIvan D Wangsa0Departemen Logistik, PT. Galangan Kalimas, Balikpapan This study develops a model that involves information the preliminary order. At first, the manufacturer provides the preliminary order for the coming week (five days) varies from day to day and is received on Friday. Change in the preliminary order for a given day is announced one day before and this is viewed as it occurs randomly. Moreover, production systems experience performance degradation (deterioration). Status of the production process shifts from in control to out of control that is identified by the last inspection. Inspection is done by sampling. At the time of the status of out of control the probability of producing non-conforming system component that is charged to the restoration cost and warranty costs.This paper is looking for a solution for determining the production batch size and the buffer stock to reduce total cost. The decision variables are production run period (T) and buffer factor (m). Having obtained the variables T and m, then the variable production batch size (QT) and the buffer stock (BT) can be determined sequentially. Heuristic methods used are Silver-Meal (SM) and Least Unit Cost (LUC) to obtain a solution for each model. Numerical examples are given to demonstrate the performance of the models. From the numerical results, it appears that LUC method is better than SM method. https://josi.ft.unand.ac.id/index.php/josi/article/view/259Perubahan order awalukuran batch produksibuffer stockmetoda heuristik (SM dan LUC)inspeksi sampling
spellingShingle Ivan D Wangsa
Model Penentuan Ukuran Batch Produksi dan Bufferstock untuk Sistem Produksi Mengalami Penurunan Kinerja dengan Mempertimbangkan Perubahan Order Awal
Jurnal Optimasi Sistem Industri
Perubahan order awal
ukuran batch produksi
buffer stock
metoda heuristik (SM dan LUC)
inspeksi sampling
title Model Penentuan Ukuran Batch Produksi dan Bufferstock untuk Sistem Produksi Mengalami Penurunan Kinerja dengan Mempertimbangkan Perubahan Order Awal
title_full Model Penentuan Ukuran Batch Produksi dan Bufferstock untuk Sistem Produksi Mengalami Penurunan Kinerja dengan Mempertimbangkan Perubahan Order Awal
title_fullStr Model Penentuan Ukuran Batch Produksi dan Bufferstock untuk Sistem Produksi Mengalami Penurunan Kinerja dengan Mempertimbangkan Perubahan Order Awal
title_full_unstemmed Model Penentuan Ukuran Batch Produksi dan Bufferstock untuk Sistem Produksi Mengalami Penurunan Kinerja dengan Mempertimbangkan Perubahan Order Awal
title_short Model Penentuan Ukuran Batch Produksi dan Bufferstock untuk Sistem Produksi Mengalami Penurunan Kinerja dengan Mempertimbangkan Perubahan Order Awal
title_sort model penentuan ukuran batch produksi dan bufferstock untuk sistem produksi mengalami penurunan kinerja dengan mempertimbangkan perubahan order awal
topic Perubahan order awal
ukuran batch produksi
buffer stock
metoda heuristik (SM dan LUC)
inspeksi sampling
url https://josi.ft.unand.ac.id/index.php/josi/article/view/259
work_keys_str_mv AT ivandwangsa modelpenentuanukuranbatchproduksidanbufferstockuntuksistemproduksimengalamipenurunankinerjadenganmempertimbangkanperubahanorderawal