Research on Dynamic Planning Method for Air–Ground Collaborative Last-Mile Delivery Considering Road Network Fragility

Urban road networks are prone to disruptions that can result in localized congestion or even complete interruptions, thereby causing delays in conventional logistics distribution. To mitigate this issue, the present study proposes a dynamic deployment model and task planning methodology for vehicle–...

Full description

Saved in:
Bibliographic Details
Main Authors: Wei Qi, Ang Li, Honghai Zhang
Format: Article
Language:English
Published: MDPI AG 2025-06-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/15/11/6322
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850129872498720768
author Wei Qi
Ang Li
Honghai Zhang
author_facet Wei Qi
Ang Li
Honghai Zhang
author_sort Wei Qi
collection DOAJ
description Urban road networks are prone to disruptions that can result in localized congestion or even complete interruptions, thereby causing delays in conventional logistics distribution. To mitigate this issue, the present study proposes a dynamic deployment model and task planning methodology for vehicle–drone collaborative delivery in areas affected by road disruptions. Utilizing complex network theory, a framework for identifying node vulnerabilities within road networks is established. Furthermore, a dynamic model for selecting drone take-off and landing sites, as well as task planning, is developed with the dual objectives of minimizing delivery costs and time while maximizing demand coverage. An enhanced evolutionary algorithm is devised to address the model. Results from case studies indicate that when the failure rate of regional road network nodes reaches 50%, the network vulnerability value is 0.8, achieving an air–ground collaborative logistics task completion rate of 95% and a delivery time of approximately 120 min. Conversely, when node failure escalates to 70%, the vulnerability value approaches 1.0, while still achieving a 90% task completion rate and a delivery time of 150 min. The proposed air–ground collaborative dynamic logistics approach effectively addresses distribution challenges in disrupted road networks and offers technical support for the advancement of urban low-altitude logistics.
format Article
id doaj-art-d67c2ae1765c4f9db499b5d7d606880e
institution OA Journals
issn 2076-3417
language English
publishDate 2025-06-01
publisher MDPI AG
record_format Article
series Applied Sciences
spelling doaj-art-d67c2ae1765c4f9db499b5d7d606880e2025-08-20T02:32:51ZengMDPI AGApplied Sciences2076-34172025-06-011511632210.3390/app15116322Research on Dynamic Planning Method for Air–Ground Collaborative Last-Mile Delivery Considering Road Network FragilityWei Qi0Ang Li1Honghai Zhang2College of Civil Aviation, Nanjing University of Aeronautics and Astronautics, Nanjing 213300, ChinaChangchun Institute of Optics, Fine Mechanics and Physics, Chinese Academy of Sciences, Changchun 130033, ChinaCollege of Civil Aviation, Nanjing University of Aeronautics and Astronautics, Nanjing 213300, ChinaUrban road networks are prone to disruptions that can result in localized congestion or even complete interruptions, thereby causing delays in conventional logistics distribution. To mitigate this issue, the present study proposes a dynamic deployment model and task planning methodology for vehicle–drone collaborative delivery in areas affected by road disruptions. Utilizing complex network theory, a framework for identifying node vulnerabilities within road networks is established. Furthermore, a dynamic model for selecting drone take-off and landing sites, as well as task planning, is developed with the dual objectives of minimizing delivery costs and time while maximizing demand coverage. An enhanced evolutionary algorithm is devised to address the model. Results from case studies indicate that when the failure rate of regional road network nodes reaches 50%, the network vulnerability value is 0.8, achieving an air–ground collaborative logistics task completion rate of 95% and a delivery time of approximately 120 min. Conversely, when node failure escalates to 70%, the vulnerability value approaches 1.0, while still achieving a 90% task completion rate and a delivery time of 150 min. The proposed air–ground collaborative dynamic logistics approach effectively addresses distribution challenges in disrupted road networks and offers technical support for the advancement of urban low-altitude logistics.https://www.mdpi.com/2076-3417/15/11/6322complex networkvulnerabilityair-ground collaborationimproved evolutionary algorithm
spellingShingle Wei Qi
Ang Li
Honghai Zhang
Research on Dynamic Planning Method for Air–Ground Collaborative Last-Mile Delivery Considering Road Network Fragility
Applied Sciences
complex network
vulnerability
air-ground collaboration
improved evolutionary algorithm
title Research on Dynamic Planning Method for Air–Ground Collaborative Last-Mile Delivery Considering Road Network Fragility
title_full Research on Dynamic Planning Method for Air–Ground Collaborative Last-Mile Delivery Considering Road Network Fragility
title_fullStr Research on Dynamic Planning Method for Air–Ground Collaborative Last-Mile Delivery Considering Road Network Fragility
title_full_unstemmed Research on Dynamic Planning Method for Air–Ground Collaborative Last-Mile Delivery Considering Road Network Fragility
title_short Research on Dynamic Planning Method for Air–Ground Collaborative Last-Mile Delivery Considering Road Network Fragility
title_sort research on dynamic planning method for air ground collaborative last mile delivery considering road network fragility
topic complex network
vulnerability
air-ground collaboration
improved evolutionary algorithm
url https://www.mdpi.com/2076-3417/15/11/6322
work_keys_str_mv AT weiqi researchondynamicplanningmethodforairgroundcollaborativelastmiledeliveryconsideringroadnetworkfragility
AT angli researchondynamicplanningmethodforairgroundcollaborativelastmiledeliveryconsideringroadnetworkfragility
AT honghaizhang researchondynamicplanningmethodforairgroundcollaborativelastmiledeliveryconsideringroadnetworkfragility