Presenting a Stochastic Model of Simultaneous Planning Problem of Distribution and Subtransmission Network Development considering the Reliability and Security Indicators

Consumption growth demands power system expansion, and changes in a network lead to changes in operation indices of the upstream network. Hence, to establish a reliable planning of the distribution network, simultaneous planning of the subtransmission network should also be taken into account. It is...

Full description

Saved in:
Bibliographic Details
Main Authors: Seyed Hossein Moayed, Hosein Hasan Shahi, Mohammadreza Akbarizadeh, Morteza Jadidoleslam, Arash Aghatehrani, Afshin Pirouzi
Format: Article
Language:English
Published: Wiley 2023-01-01
Series:International Transactions on Electrical Energy Systems
Online Access:http://dx.doi.org/10.1155/2023/8198865
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850174486020620288
author Seyed Hossein Moayed
Hosein Hasan Shahi
Mohammadreza Akbarizadeh
Morteza Jadidoleslam
Arash Aghatehrani
Afshin Pirouzi
author_facet Seyed Hossein Moayed
Hosein Hasan Shahi
Mohammadreza Akbarizadeh
Morteza Jadidoleslam
Arash Aghatehrani
Afshin Pirouzi
author_sort Seyed Hossein Moayed
collection DOAJ
description Consumption growth demands power system expansion, and changes in a network lead to changes in operation indices of the upstream network. Hence, to establish a reliable planning of the distribution network, simultaneous planning of the subtransmission network should also be taken into account. It is predicted that this planning impacts different technical indices; therefore, formulation of various technical indices need to be included in the planning model. Therefore, in this study, the stochastic problem model of simultaneous planning of distribution and super distribution network development considering the reliability and security indicators is presented. The aforementioned problem is in the form of an optimization problem whose objective function is to minimize the costs of construction, replacement, operation, maintenance, reliability, and security. Furthermore, the mentioned problem is bound to the equations of power distribution, reliability, and security of voltage in addition to the limitation of network indicators. It is worth mentioning that, in the proposed problem, the active and reactive loads in addition to the operating price are in the form of uncertainty. Thus, the mentioned problem is in the form of a stochastic problem in which the point estimation method is used to evaluate the scenarios. Simultaneous expansion planning of distribution and subtransmission networks along with the placement of distributed generations and capacitors, as well as modeling security and reliability indices, is the novelty of the proposed scheme. In the end, the proposed problem is applied to the test network by GAMS optimization software, and then the capabilities of the proposed problem are extracted. Accordingly, based on numerical results, the expansion of distribution networks imposes considerable cost. Moreover, expansion planning of both distribution and subtransmission networks helps voltage to be in its permissible range, lower power loss, and improve reliability and security to 100%.
format Article
id doaj-art-d5ceb3bb62874064a82df8765b88a11c
institution OA Journals
issn 2050-7038
language English
publishDate 2023-01-01
publisher Wiley
record_format Article
series International Transactions on Electrical Energy Systems
spelling doaj-art-d5ceb3bb62874064a82df8765b88a11c2025-08-20T02:19:38ZengWileyInternational Transactions on Electrical Energy Systems2050-70382023-01-01202310.1155/2023/8198865Presenting a Stochastic Model of Simultaneous Planning Problem of Distribution and Subtransmission Network Development considering the Reliability and Security IndicatorsSeyed Hossein Moayed0Hosein Hasan Shahi1Mohammadreza Akbarizadeh2Morteza Jadidoleslam3Arash Aghatehrani4Afshin Pirouzi5Department of Electrical and Computer EngineeringDepartment of Electrical EngineeringDepartment of Electrical EngineeringDepartment of Electrical EngineeringDepartment of Electrical EngineeringDepartment of EngineeringConsumption growth demands power system expansion, and changes in a network lead to changes in operation indices of the upstream network. Hence, to establish a reliable planning of the distribution network, simultaneous planning of the subtransmission network should also be taken into account. It is predicted that this planning impacts different technical indices; therefore, formulation of various technical indices need to be included in the planning model. Therefore, in this study, the stochastic problem model of simultaneous planning of distribution and super distribution network development considering the reliability and security indicators is presented. The aforementioned problem is in the form of an optimization problem whose objective function is to minimize the costs of construction, replacement, operation, maintenance, reliability, and security. Furthermore, the mentioned problem is bound to the equations of power distribution, reliability, and security of voltage in addition to the limitation of network indicators. It is worth mentioning that, in the proposed problem, the active and reactive loads in addition to the operating price are in the form of uncertainty. Thus, the mentioned problem is in the form of a stochastic problem in which the point estimation method is used to evaluate the scenarios. Simultaneous expansion planning of distribution and subtransmission networks along with the placement of distributed generations and capacitors, as well as modeling security and reliability indices, is the novelty of the proposed scheme. In the end, the proposed problem is applied to the test network by GAMS optimization software, and then the capabilities of the proposed problem are extracted. Accordingly, based on numerical results, the expansion of distribution networks imposes considerable cost. Moreover, expansion planning of both distribution and subtransmission networks helps voltage to be in its permissible range, lower power loss, and improve reliability and security to 100%.http://dx.doi.org/10.1155/2023/8198865
spellingShingle Seyed Hossein Moayed
Hosein Hasan Shahi
Mohammadreza Akbarizadeh
Morteza Jadidoleslam
Arash Aghatehrani
Afshin Pirouzi
Presenting a Stochastic Model of Simultaneous Planning Problem of Distribution and Subtransmission Network Development considering the Reliability and Security Indicators
International Transactions on Electrical Energy Systems
title Presenting a Stochastic Model of Simultaneous Planning Problem of Distribution and Subtransmission Network Development considering the Reliability and Security Indicators
title_full Presenting a Stochastic Model of Simultaneous Planning Problem of Distribution and Subtransmission Network Development considering the Reliability and Security Indicators
title_fullStr Presenting a Stochastic Model of Simultaneous Planning Problem of Distribution and Subtransmission Network Development considering the Reliability and Security Indicators
title_full_unstemmed Presenting a Stochastic Model of Simultaneous Planning Problem of Distribution and Subtransmission Network Development considering the Reliability and Security Indicators
title_short Presenting a Stochastic Model of Simultaneous Planning Problem of Distribution and Subtransmission Network Development considering the Reliability and Security Indicators
title_sort presenting a stochastic model of simultaneous planning problem of distribution and subtransmission network development considering the reliability and security indicators
url http://dx.doi.org/10.1155/2023/8198865
work_keys_str_mv AT seyedhosseinmoayed presentingastochasticmodelofsimultaneousplanningproblemofdistributionandsubtransmissionnetworkdevelopmentconsideringthereliabilityandsecurityindicators
AT hoseinhasanshahi presentingastochasticmodelofsimultaneousplanningproblemofdistributionandsubtransmissionnetworkdevelopmentconsideringthereliabilityandsecurityindicators
AT mohammadrezaakbarizadeh presentingastochasticmodelofsimultaneousplanningproblemofdistributionandsubtransmissionnetworkdevelopmentconsideringthereliabilityandsecurityindicators
AT mortezajadidoleslam presentingastochasticmodelofsimultaneousplanningproblemofdistributionandsubtransmissionnetworkdevelopmentconsideringthereliabilityandsecurityindicators
AT arashaghatehrani presentingastochasticmodelofsimultaneousplanningproblemofdistributionandsubtransmissionnetworkdevelopmentconsideringthereliabilityandsecurityindicators
AT afshinpirouzi presentingastochasticmodelofsimultaneousplanningproblemofdistributionandsubtransmissionnetworkdevelopmentconsideringthereliabilityandsecurityindicators