THE VERIFICATION CALCULUS OF THE DRIVING WHEEL OF THE EXTRACTION MACHINE AT THE OLD PIT WITH A SKIP – LONEA MINING PLANT
Extracting coal from the underground and sterile from Mining Plant Lonea is made by using the extraction installation with a skip, which includes an extraction machine located in the tower of the old pit, having two skips of 8 tons each. Any malfunction of the extraction machine can lead to impor...
Saved in:
| Main Authors: | Răzvan Bogdan ITU, Iosif DUMITRESCU |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Academica Brancusi
2019-05-01
|
| Series: | Fiabilitate şi Durabilitate |
| Subjects: | |
| Online Access: | http://www.utgjiu.ro/rev_mec/mecanica/pdf/2019-01/21_R%C4%83zvan%20Bogdan%20ITU,%20Iosif%20DUMITRESCU%20-%20THE%20VERIFICATION%20CALCULUS%20OF%20THE%20DRIVING%20WHEEL%20OF%20THE%20EXTRACTION%20MACHINE%20AT%20THE%20OLD%20PIT%20WITH%20A%20SKIP%20%E2%80%93%20LONEA%20MINING%20PLANT.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
THE VERIFICATION BY CALCULUS OF THE TRANSMISSION OF THE EXTRACTION MACHINE'S REDUCER FROM THE OLD PIT WITH SKIP – LONEA MINIG PLANT
by: Răzvan Bogdan ITU, et al.
Published: (2019-05-01) -
DIAGNOSIS OF THE WINDING MACHINE IN THE OLD SHAFT WITH SKIP IN LONEA MINING PLANT
by: Răzvan Bogdan ITU, et al.
Published: (2017-05-01) -
THE VERIFICATION BRAKE MECHANISM OF WINDING MACHINES WITH SINGLE CABLE DRIVING WHEELS ON
by: Răzvan Bogdan ITU, et al.
Published: (2017-12-01) -
Research and application of locomotive wheel reprofiling model targeting flange thickening
by: LIU Tong, et al.
Published: (2022-09-01) -
Using individual tractor wheel drive through electric traction
by: А. V. Bizhaev, et al.
Published: (2024-06-01)