A Robust, Resilience Machine Learning With a Risk Approach for Project Scheduling
ABSTRACT This study proposes a novel Robust, Resilient, and Risk‐Based approach in Machine Learning (3RML) that emphasizes the application of project scheduling for the first time. A robust stochastic LASSO regression model is proposed to predict project duration. This model seeks to enhance a tradi...
Saved in:
| Main Authors: | Reza Lotfi, Soheila Sadeghi, Sadia Samar Ali, Fatemeh Ramyar, Ehsan Ghafourian, Ebrahim Farbod |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2025-06-01
|
| Series: | Engineering Reports |
| Subjects: | |
| Online Access: | https://doi.org/10.1002/eng2.70161 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Software Project Scheduling Problem: A Review
by: Javad Pashaei Barbin, et al.
Published: (2025-08-01) -
EPO Extension of Dispatching Rules to Minimize Effects of Time Uncertainty in Production Scheduling
by: Radosław Puka, et al.
Published: (2025-07-01) -
Multi-Project Scheduling with Uncertainty and Resource Flexibility: A Narrative Review and Exploration of Future Landscapes
by: Marzieh Aghileh, et al.
Published: (2025-05-01) -
Establishing Empirical Relationship Between Project Scheduling and Project Success in the Uganda Construction Industry.
by: Mukisa, John
Published: (2024) -
An expert analytical approach to reducing construction project delays from ineffective scheduling
by: Joseph, O. S, et al.
Published: (2025)