Research on Control of Short EMU Reconnection Passing Neutral Section

In order to solve the problem that the reconnection of CRH6F-A/CRH6A-A short intercity EMU can not meet the requirements of the length of neutral section of domestic lines, the reconnection control method of short intercity EMU was studied,and the reconnection control strategy of single pantograph p...

Full description

Saved in:
Bibliographic Details
Main Authors: Wantao XU, Zhaoxiang TANG, Zheng CHEN, Pengfei CHI, Zhuangzhuang XIN
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2021-07-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2021.04.101
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850143240262516736
author Wantao XU
Zhaoxiang TANG
Zheng CHEN
Pengfei CHI
Zhuangzhuang XIN
author_facet Wantao XU
Zhaoxiang TANG
Zheng CHEN
Pengfei CHI
Zhuangzhuang XIN
author_sort Wantao XU
collection DOAJ
description In order to solve the problem that the reconnection of CRH6F-A/CRH6A-A short intercity EMU can not meet the requirements of the length of neutral section of domestic lines, the reconnection control method of short intercity EMU was studied,and the reconnection control strategy of single pantograph passing neutral section was put forward. A kind of valve plate used for quick putting down pantograph was designed, and the performance of the lifting and dropping pantograph under different speed grades was tested through experiments, which included the signal response speed, the time and distance of lifting and dropping pantograph, and the arcing performance of the pantograph. The test results show that the single pantograph passing neutral section control technology is feasible and the arc-ignition rate of pantograph-catenary system is low when the pantograph-catenary system is lifting and dropping dynamically, and the impact on the pantograph-catenary is small. The research overcame the bottleneck of the length limitation of the neutral section in the multiple operation of the short marshalling EMU, realized the flexible operation of the short marshalling EMU,and effectively relieved the passenger pressure in the peak period of passenger flow.
format Article
id doaj-art-ce2bbb4a5feb439492c4e599f7497c76
institution OA Journals
issn 1000-128X
language zho
publishDate 2021-07-01
publisher Editorial Department of Electric Drive for Locomotives
record_format Article
series 机车电传动
spelling doaj-art-ce2bbb4a5feb439492c4e599f7497c762025-08-20T02:28:46ZzhoEditorial Department of Electric Drive for Locomotives机车电传动1000-128X2021-07-01202520904233Research on Control of Short EMU Reconnection Passing Neutral SectionWantao XUZhaoxiang TANGZheng CHENPengfei CHIZhuangzhuang XINIn order to solve the problem that the reconnection of CRH6F-A/CRH6A-A short intercity EMU can not meet the requirements of the length of neutral section of domestic lines, the reconnection control method of short intercity EMU was studied,and the reconnection control strategy of single pantograph passing neutral section was put forward. A kind of valve plate used for quick putting down pantograph was designed, and the performance of the lifting and dropping pantograph under different speed grades was tested through experiments, which included the signal response speed, the time and distance of lifting and dropping pantograph, and the arcing performance of the pantograph. The test results show that the single pantograph passing neutral section control technology is feasible and the arc-ignition rate of pantograph-catenary system is low when the pantograph-catenary system is lifting and dropping dynamically, and the impact on the pantograph-catenary is small. The research overcame the bottleneck of the length limitation of the neutral section in the multiple operation of the short marshalling EMU, realized the flexible operation of the short marshalling EMU,and effectively relieved the passenger pressure in the peak period of passenger flow.http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2021.04.101short marshallingEMUreconnectionpassing neutral sectionhigh-speed railway
spellingShingle Wantao XU
Zhaoxiang TANG
Zheng CHEN
Pengfei CHI
Zhuangzhuang XIN
Research on Control of Short EMU Reconnection Passing Neutral Section
机车电传动
short marshalling
EMU
reconnection
passing neutral section
high-speed railway
title Research on Control of Short EMU Reconnection Passing Neutral Section
title_full Research on Control of Short EMU Reconnection Passing Neutral Section
title_fullStr Research on Control of Short EMU Reconnection Passing Neutral Section
title_full_unstemmed Research on Control of Short EMU Reconnection Passing Neutral Section
title_short Research on Control of Short EMU Reconnection Passing Neutral Section
title_sort research on control of short emu reconnection passing neutral section
topic short marshalling
EMU
reconnection
passing neutral section
high-speed railway
url http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2021.04.101
work_keys_str_mv AT wantaoxu researchoncontrolofshortemureconnectionpassingneutralsection
AT zhaoxiangtang researchoncontrolofshortemureconnectionpassingneutralsection
AT zhengchen researchoncontrolofshortemureconnectionpassingneutralsection
AT pengfeichi researchoncontrolofshortemureconnectionpassingneutralsection
AT zhuangzhuangxin researchoncontrolofshortemureconnectionpassingneutralsection