Implementation of Security Standardization in Construction of No.3 and No.4 West Diversion Tunnel in Jinping Phase 2 Hydroelectric Station
Saved in:
| Main Authors: | WANG Zhi, WEI Li-na |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2010-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47659995&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Microseismic Monitoring of Energy Changes in Deep Tunnels during the TBM Tunneling of the Jinping II Hydropower Station
by: Duanyang Zhuang, et al.
Published: (2018-01-01) -
To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction
by: V. Kh. Nasibov
Published: (2006-10-01) -
Comparative Study of the Excavation Damage and Rockburst of the Deeply Buried Jinping II Diversion Tunnels Using a TBM and the Drilling-Blasting Method
by: Jing Yang, et al.
Published: (2020-01-01) -
Long-Term Mechanical Response of Jinping Ultra-Deep Tunnels Considering Pore Pressure and Engineering Disturbances
by: Ersheng Zha, et al.
Published: (2025-07-01) -
Hydraulic Research for Spillway Dam of Grodno Hydroelectric Station
by: G. G. Kruglov, et al.
Published: (2009-04-01)