A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term Operation

To obtain the License Renewal (LR) for the Long-Term Operation (LTO) of a Nuclear Power Plants (NPPs) is important ensuring the integrity of Structures, Systems, and Components (SSCs). Additionally, the SSCs must continue to perform their intended functions under Design Extended Conditions (DEC). D...

Full description

Saved in:
Bibliographic Details
Main Authors: Maritza Rodríguez Gual, Jorge Armando P. Junior
Format: Article
Language:English
Published: Brazilian Radiation Protection Society (Sociedade Brasileira de Proteção Radiológica, SBPR) 2025-06-01
Series:Brazilian Journal of Radiation Sciences
Subjects:
Online Access:https://bjrs.org.br/revista/index.php/REVISTA/article/view/2636
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849317789556277248
author Maritza Rodríguez Gual
Jorge Armando P. Junior
author_facet Maritza Rodríguez Gual
Jorge Armando P. Junior
author_sort Maritza Rodríguez Gual
collection DOAJ
description To obtain the License Renewal (LR) for the Long-Term Operation (LTO) of a Nuclear Power Plants (NPPs) is important ensuring the integrity of Structures, Systems, and Components (SSCs). Additionally, the SSCs must continue to perform their intended functions under Design Extended Conditions (DEC). DEC encompasses a wide range of conditions beyond the design basis, including both severe and non-severe scenarios. The ageing process can compromise the intended functions of SSCs in a NPP. NPPs must demonstrate their ability to cope with DEC without compromising safety. The objective of this paper is to describe one methodology have been developed to identify SSCs with scope of LR needed to cope with the DEC in LTO. The proposed methodology follows the recommendation of U.S. Nuclear Regulatory Commission (NRC) requirements and the International Atomic Energy Agency (IAEA) safety standards and demonstrating their commitment to safety and environmental protection. The main contributions of the new methodology is to identify the systems, components and subcomponents needed to cope with design extensions conditions  that not  have Maintenance Program (MP) or Aging Management Program (AMP) and address these components in the plant level AMP or recommend an Aging Managements Review (AMR) according to their characteristic and function. Accomplish the intended safety functions of SSCs throughout the plant's operational lifetime including during LTO is crucial to safety and reliable operation of the plant. An example of application of the proposed methodology is presented.
format Article
id doaj-art-cafc35afd8124c3380db2abc8f0d746c
institution Kabale University
issn 2319-0612
language English
publishDate 2025-06-01
publisher Brazilian Radiation Protection Society (Sociedade Brasileira de Proteção Radiológica, SBPR)
record_format Article
series Brazilian Journal of Radiation Sciences
spelling doaj-art-cafc35afd8124c3380db2abc8f0d746c2025-08-20T03:51:07ZengBrazilian Radiation Protection Society (Sociedade Brasileira de Proteção Radiológica, SBPR)Brazilian Journal of Radiation Sciences2319-06122025-06-01124B (Suppl.)10.15392/2319-0612.2024.26362261A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term OperationMaritza Rodríguez Gual0https://orcid.org/0000-0002-3585-8264Jorge Armando P. Junior1https://orcid.org/0009-0001-7564-5837Analysis, Evaluation and Risk Management Laboratory (LabRisco)Eletronuclear To obtain the License Renewal (LR) for the Long-Term Operation (LTO) of a Nuclear Power Plants (NPPs) is important ensuring the integrity of Structures, Systems, and Components (SSCs). Additionally, the SSCs must continue to perform their intended functions under Design Extended Conditions (DEC). DEC encompasses a wide range of conditions beyond the design basis, including both severe and non-severe scenarios. The ageing process can compromise the intended functions of SSCs in a NPP. NPPs must demonstrate their ability to cope with DEC without compromising safety. The objective of this paper is to describe one methodology have been developed to identify SSCs with scope of LR needed to cope with the DEC in LTO. The proposed methodology follows the recommendation of U.S. Nuclear Regulatory Commission (NRC) requirements and the International Atomic Energy Agency (IAEA) safety standards and demonstrating their commitment to safety and environmental protection. The main contributions of the new methodology is to identify the systems, components and subcomponents needed to cope with design extensions conditions  that not  have Maintenance Program (MP) or Aging Management Program (AMP) and address these components in the plant level AMP or recommend an Aging Managements Review (AMR) according to their characteristic and function. Accomplish the intended safety functions of SSCs throughout the plant's operational lifetime including during LTO is crucial to safety and reliable operation of the plant. An example of application of the proposed methodology is presented. https://bjrs.org.br/revista/index.php/REVISTA/article/view/2636Desing Extended ConditionLong Term OperationNPPAging Management
spellingShingle Maritza Rodríguez Gual
Jorge Armando P. Junior
A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term Operation
Brazilian Journal of Radiation Sciences
Desing Extended Condition
Long Term Operation
NPP
Aging Management
title A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term Operation
title_full A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term Operation
title_fullStr A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term Operation
title_full_unstemmed A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term Operation
title_short A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term Operation
title_sort new methodology to identify structures systems and components needed to cope with design extended conditions in the scope of a nuclear power plant long term operation
topic Desing Extended Condition
Long Term Operation
NPP
Aging Management
url https://bjrs.org.br/revista/index.php/REVISTA/article/view/2636
work_keys_str_mv AT maritzarodriguezgual anewmethodologytoidentifystructuressystemsandcomponentsneededtocopewithdesignextendedconditionsinthescopeofanuclearpowerplantlongtermoperation
AT jorgearmandopjunior anewmethodologytoidentifystructuressystemsandcomponentsneededtocopewithdesignextendedconditionsinthescopeofanuclearpowerplantlongtermoperation
AT maritzarodriguezgual newmethodologytoidentifystructuressystemsandcomponentsneededtocopewithdesignextendedconditionsinthescopeofanuclearpowerplantlongtermoperation
AT jorgearmandopjunior newmethodologytoidentifystructuressystemsandcomponentsneededtocopewithdesignextendedconditionsinthescopeofanuclearpowerplantlongtermoperation