Design and Construction of Sewage Structures Under High-Level Underground Water Conditions Using theTop-Down Method: A Case Study of Sewage Pumping Station PS2 in Dorood City
In this paper, various issues related to the design and construction of a pump station under high-level underground water conditions in Dorood City using different approaches are investigated. These methods include deep wells, sheet pile walls, and secant walls. By evaluating the deficiencies of the...
Saved in:
Main Authors: | Bahador Mirzaei, Abbas Pirayandeh, Hojjat Emami |
---|---|
Format: | Article |
Language: | English |
Published: |
Water and Wastewater Consulting Engineers Research Development
2024-08-01
|
Series: | آب و فاضلاب |
Subjects: | |
Online Access: | https://www.wwjournal.ir/article_209265_a17b03af89ae63f906fa9ca4a226e8ed.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Main Problems and Countermeasures for Sewage Treatment in Small Towns
by: WANG Qingyu, et al.
Published: (2020-01-01) -
Parasites in Sewage: Legal Requirements and Diagnostic Tools
by: Oliwia Obuch-Woszczatyńska, et al.
Published: (2025-01-01) -
Mechanically Twisting‐Induced Top‐Down Chirality Transfer for Tunable Full‐Color Circularly Polarized Luminescent Fibers
by: Xiaoxiao Yu, et al.
Published: (2025-01-01) -
A Verification and Evaluation Method for Top-down Design of Sprag Clutches
by: Yu Hao, et al.
Published: (2023-10-01) -
COMPLEX FOR MONITORING OF SEWAGE OPTICAL DENSITY CHANGES
by: V. A. Alekseev, et al.
Published: (2018-03-01)