Water Resources Deployment Task in the Datengxia Water Project
Saved in:
| Main Authors: | XI Wang-chao, LIU Xi-yan |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2006-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47665471&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of Integrated Construction of Business and Finance in Datengxia Water Control Project
by: DENG Min, et al.
Published: (2022-01-01) -
Research and Practice of Drift Control Methods of Datengxia Water Conservancy Project
by: LI Zhenjiang, et al.
Published: (2023-01-01) -
Development and Application of UAV VR Panoramic Display System for Datengxia Water Project
by: ZHANG Yao, et al.
Published: (2021-01-01) -
Study on Structure and Seepage Control Safety of Second-Phase Cofferdam in Datengxia Water Conservancy Project
by: ZUO Yongzhen, et al.
Published: (2023-01-01) -
Research and Application of the Hydraulic Connection Section in Nanmujiang River Fishway at Datengxia Water Conservancy Project
by: FAN Suixing, et al.
Published: (2022-01-01)