Numerical Simulation Research of Smooth Wall Blasting Using the Timing Sequence Control Method under Different Primary Blast Hole Shapes
To make sure the integrity and stability of surrounding rock structure during blasting excavation of important structural planes in deep underground caverns, two kinds of fine blasting methods, timing sequence control fracture blasting network and notch blast hole, are innovatively combined and the...
Saved in:
| Main Authors: | XinPing Li, JunLin Lv, JunHong Huang, Yi Luo, TingTing Liu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2019-01-01
|
| Series: | Shock and Vibration |
| Online Access: | http://dx.doi.org/10.1155/2019/2425904 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Influence of blast hole shape and in-situ stress on blast damage evolution in granite by numerical simulation
by: Cunquan Wu, et al.
Published: (2025-08-01) -
Mechanism Study on Elevation Effect of Blast Wave Propagation in High Side Wall of Deep Underground Powerhouse
by: Xinping Li, et al.
Published: (2018-01-01) -
Numerical Investigation on Influential Factors for Quality of Smooth Blasting in Rock Tunnels
by: Baoping Zou, et al.
Published: (2020-01-01) -
Numerical Simulation on Selection of Optimal Delay Time for Precise Delay Blasting
by: Jun Ma, et al.
Published: (2021-01-01) -
Analysis of Blasting Efficiency Using Crack-Inducing Holes and Pre-Splitting Method in Blasting
by: Ji-Wan Yoo, et al.
Published: (2025-02-01)