Sub-activity Time-Cost Trade-off Model of Building Structural Beam on the Projects in the North Aceh Region
Problems for both delayed and accelerated activities in scheduling are common in most projects. This problem can implicate on the additional construction cost with different trends as a specific model. A model can provide valuable information to project acceleration judgement. This research aims to...
Saved in:
| Main Authors: | Fachrurrazi Fachrurrazi, Abdullah Abdullah, Yuwaldi Away, Teuku Budi Aulia |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Syiah Kuala University
2019-08-01
|
| Series: | Aceh International Journal of Science and Technology |
| Subjects: | |
| Online Access: | https://jurnal.usk.ac.id/AIJST/article/view/13218 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis Of The Addition Of Steel Plates Reviewed to The Compresivve Strength Capacity Of The T-Beam
by: Endah Kanti Pangestuti, et al.
Published: (2023-04-01) -
OPTIMIZATION OF DOUBLY REINFORCED BEAM DESIGN USING SIMULATED ANNEALING
by: SIMON OLAYIWOLA ADEREMI OLAWALE, et al.
Published: (2020-07-01) -
Evaluation of the KDS 14 Draft Design Method for Predicting the Shear Strength of Prestressed Concrete Beams
by: Ngoc Hieu Dinh, et al.
Published: (2025-06-01) -
The Unit Price Implication of Reinforcement Usage in Tie Beam Reinforced Concrete Construction
by: Mubarak Mubarak, et al.
Published: (2018-04-01) -
Stress Redistribution in Statically Indeterminate Corroded Reinforced Concrete Beams
by: A. G. Tamrazyan
Published: (2024-12-01)