Model and Algorithm of Cooperative Optimization Decomposition for Short-Term Contract Electricity Considering Wind Power Uncertainty
Most of the existing contract electricity decomposition methods do not take into account the impact of wind power uncertainty and do not coordinate with the generation plan for optimization, resulting in their insufficient execution when the contract is due. A new cooperative optimization decomposit...
Saved in:
| Main Authors: | Lingjie LIU, Jikeng LIN |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
State Grid Energy Research Institute
2023-12-01
|
| Series: | Zhongguo dianli |
| Subjects: | |
| Online Access: | https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.202305031 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Capacity planning for hydro-wind-photovoltaic-storage systems considering high-dimensional uncertainties
by: Xiongwei Li, et al.
Published: (2025-01-01) -
Multi-objective Flexible Planning of Transmission Network Considering Wind Power and Load Uncertainties
by: Juanjuan WANG, et al.
Published: (2022-01-01) -
Comparison of IGDT, TOAT and STC Methods in Robust Planning of Transmission Network Expansion in the Presence of Uncertainties
by: Shahriar Abbasi
Published: (2024-04-01) -
A Multi-objective Robust Planning Method for Thermal-Electrical Coupling Micro-energy System Considering the Uncertainty of Renewable Energy
by: Min ZHANG, et al.
Published: (2021-04-01) -
Progress of the Research of Guidance Methods for Mars Entry Considering Uncertainty
by: JIANG Xiuqiang, et al.
Published: (2019-01-01)