A Constraint Programming Method for Advanced Planning and Scheduling System with Multilevel Structured Products
This paper deals with the advanced planning and scheduling (APS) problem with multilevel structured products. A constraint programming model is constructed for the problem with the consideration of precedence constraints, capacity constraints, release time and due date. A new constraint programming...
Saved in:
| Main Authors: | Yunfang Peng, Dandan Lu, Yarong Chen |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2014-01-01
|
| Series: | Discrete Dynamics in Nature and Society |
| Online Access: | http://dx.doi.org/10.1155/2014/917685 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Efficient Task Scheduling Using Constraints Programming for Enhanced Planning and Reliability
by: JaeBong Cho, et al.
Published: (2024-12-01) -
Modeling and Evolutionary Optimization on Multilevel Production Scheduling: A Case Study
by: Ruifeng Shi, et al.
Published: (2010-01-01) -
Scheduling Optimization of Electric Rubber-Tired Vehicles in Underground Coal Mines Based on Constraint Programming
by: Maoquan Wan, et al.
Published: (2025-05-01) -
Optimal Scheduling of a Microgrid Including Pump Scheduling and Network Constraints
by: Ashok Krishnan, et al.
Published: (2018-01-01) -
ALGORITHMIC CONSTRUCTION SCHEDULES IN CONDITIONS OF TIMING CONSTRAINTS
by: Alexey S. Dobrynin, et al.
Published: (2016-08-01)