Case Study for Emergency Reinforcement of Water Project
Saved in:
| Main Author: | 钟云 |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2003-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47670859&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of reinforcement learning for integrating project risk analysis and risk response planning: A case study on construction projects
by: Sajad Soltan, et al.
Published: (2025-01-01) -
Projection Group Decision-making Model of Water Conservancy Project Emergency Plans Based on Interval Intuitionistic Fuzzy Information
by: CAO Xiongfeng, et al.
Published: (2022-01-01) -
Summary of the Archive Management in the Pearl River Emergent Water Deployment Project for Salty Water Resistance and Fresh Water Supply in 2005
by: GUO Yan-ling
Published: (2007-01-01) -
Application of Controlled Blasting in Dahaiting Reservoir Reinforcement Project
by: 姚德贵, et al.
Published: (2003-01-01) -
Selection of Water Purification Technology for Tap Water Supply Project in Villages in Mountainous Areas of Eastern Guangdong:A Case Study of Tap Water Supply Project in Villages of Dabu County
by: DING Shengyan, et al.
Published: (2023-01-01)