Differential Settlement of Intersecting Buildings in an Offshore Reclamation Project
This paper addresses the problem of open gaps caused by differential settlement in the process of constructing sluice buildings in soft soil beach areas, combined with the construction of sluice and supporting facilities in a reclamation project. First, the change rules for the shear strength and co...
Saved in:
| Main Authors: | Jing-Bo Su, Zheng-yang Yu, Ya-Ru Lv, Yi-Huan Zhu, Hua-Qing Wang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2019-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2019/9453620 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Fine Sediment Dispersion in the Addu-City Dredging and Reclamation Project
by: Efstratios N. Fonias, et al.
Published: (2025-03-01) -
Developing a Reclamation Framework to Promote Circularity in Demolition Projects
by: Mariah Saad, et al.
Published: (2024-11-01) -
Development and Utilization of Marine Ecological Landscape Restoration Model in Reclamation Project
by: MA Xuesong, et al.
Published: (2024-10-01) -
Feasibility of In-Situ Aeration of Old Dumping Ground for Land Reclamation
by: Huan-Huan Tong, et al.
Published: (2013-12-01) -
a reclamation of the disposable
by: maura nguyễn donohue
Published: (2023-04-01)