Impact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects
Standardized information on the processes and requirements for information exchanges is critical to ensure accurate cost estimations. However, traditional methods based on 2D information lack the standardization and information required for efficient and reliable early commercial evaluation. This st...
Saved in:
| Main Authors: | Claudia Rojas, Claudio Mourgues, Pilar de la Rosa, Harrison Mesa, Francisco Ruz, Pablo Guindos |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-05-01
|
| Series: | Buildings |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2075-5309/15/11/1835 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Comprehensive Comparison of Insulation Materials for Timber Building Systems
by: Bernardino M. Rocha, et al.
Published: (2025-05-01) -
IDM for the Conceptual Evaluation Process of Industrialized Timber Projects
by: Claudia Rojas Wettling, et al.
Published: (2023-01-01) -
The Timber Value of an Existing Forest Stand
by: Andres Susaeta
Published: (2021-03-01) -
The Impact of BIM Technology on the Lifecycle Cost Control of Prefabricated Buildings: Evidence from China
by: Jinkun Sun, et al.
Published: (2024-11-01) -
MMORPG-based collaborative design and construction simulation in prefabricated buildings
by: Hongyu Ye, et al.
Published: (2025-05-01)