Wear - Sediment Quantity Correlation Model for Preventive Maintenance Scheduling of a Hydroelectric Power Plant
The present research is carried out for the improvement of the availability of a hydroelectric power plant through a wear-sediment quantity correlation model for the scheduling of its preventive maintenance, the data is based on the measurement of blade thicknesses, as well as visual inspection to...
Saved in:
Main Authors: | Kleber Zhañay, Cristian Leiva, Erika Pilataxi, William Quitiaquez |
---|---|
Format: | Article |
Language: | English |
Published: |
Operador Nacional de Electricidad – CENACE
2025-01-01
|
Series: | Revista Técnica Energía |
Subjects: | |
Online Access: | https://revistaenergia.cenace.gob.ec/index.php/cenace/article/view/691 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Development of Small Hydroelectric Power Plant Maintenance Costs using Chaos Embedded Adaptive Particle Swarm Optimization
by: Mahmut Temel Özdemir, et al.
Published: (2023-12-01) -
Sensor Image, Anomaly Detection Method for Hydroelectric Dam Structure Using Sensors Measurements and Deep Learning
by: Van-Phuong Ha, et al.
Published: (2025-01-01) -
Evaluation of prognosis solutions for wind turbine using multi agent simulation of maintenance business
by: Junya WATANABE, et al.
Published: (2024-12-01) -
Regularities of the Development of Coastal Processes on Water Reservoirs of Hydroelectric Power Plants of Belarus
by: V. E. Levkevich
Published: (2018-10-01) -
Changes in sediment connectivity and its impact on sediment transport in a typical watershed of Southern Jiangxi Province, China
by: Fei Sheng, et al.
Published: (2025-02-01)