A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils

The cut-and-cover technique is widely used in the field of tunnel engineering owing to its simple construction technology, high working efficiency, and low cost. However, the safety of the foundation pit and the environmental impact during excavation are of great concern, especially for tunnels that...

Full description

Saved in:
Bibliographic Details
Main Authors: Jian Wu, Zhifang Zhou, Wenjun Xia, Haixiao Wang, Zhongqiang Fang
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/6184411
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832566639018639360
author Jian Wu
Zhifang Zhou
Wenjun Xia
Haixiao Wang
Zhongqiang Fang
author_facet Jian Wu
Zhifang Zhou
Wenjun Xia
Haixiao Wang
Zhongqiang Fang
author_sort Jian Wu
collection DOAJ
description The cut-and-cover technique is widely used in the field of tunnel engineering owing to its simple construction technology, high working efficiency, and low cost. However, the safety of the foundation pit and the environmental impact during excavation are of great concern, especially for tunnels that pass through lakes and/or rivers. In this paper, a novel excavation and construction method is presented for the Taihu tunnel, which is the longest lake-crossing tunnel in China. In this method, a cofferdam of double-row steel sheet piles (DSSPs) was designed in order to divide the overlying excavation into several closed zones. During the construction, four zones were regarded as a unit, and different construction steps were carried out simultaneously in each zone. Therefore, an assembly line for the tunnel excavation was established to accelerate the construction speed. The most distinctive advantage of this method is that the excavation did not cut off the normal flow of the lake water and the shipping routes, with low environmental impact. To investigate the tunnel deformation during excavation, a finite element analysis combined with field monitoring data was adopted, indicating that the magnitude of the tunnel deformation was notably less than those reported from other excavation projects. Moreover, the effect of groundwater on the piles and the safety of the foundation pit was revealed using numerical modelling. This study provides a new idea for the design and construction of tunnel engineering, especially for extra-long underwater tunnels in soft deposits.
format Article
id doaj-art-c4cff8bbf5a244e19fe8725a386cdbc2
institution Kabale University
issn 1687-8094
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-c4cff8bbf5a244e19fe8725a386cdbc22025-02-03T01:03:41ZengWileyAdvances in Civil Engineering1687-80942021-01-01202110.1155/2021/6184411A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft SoilsJian Wu0Zhifang Zhou1Wenjun Xia2Haixiao Wang3Zhongqiang Fang4School of Earth Sciences and EngineeringSchool of Earth Sciences and EngineeringConstruction Bureau of Traffic Engineering in Jiangsu ProvinceConstruction Bureau of Traffic Engineering in Jiangsu ProvinceChina Design Group Co., Ltd.The cut-and-cover technique is widely used in the field of tunnel engineering owing to its simple construction technology, high working efficiency, and low cost. However, the safety of the foundation pit and the environmental impact during excavation are of great concern, especially for tunnels that pass through lakes and/or rivers. In this paper, a novel excavation and construction method is presented for the Taihu tunnel, which is the longest lake-crossing tunnel in China. In this method, a cofferdam of double-row steel sheet piles (DSSPs) was designed in order to divide the overlying excavation into several closed zones. During the construction, four zones were regarded as a unit, and different construction steps were carried out simultaneously in each zone. Therefore, an assembly line for the tunnel excavation was established to accelerate the construction speed. The most distinctive advantage of this method is that the excavation did not cut off the normal flow of the lake water and the shipping routes, with low environmental impact. To investigate the tunnel deformation during excavation, a finite element analysis combined with field monitoring data was adopted, indicating that the magnitude of the tunnel deformation was notably less than those reported from other excavation projects. Moreover, the effect of groundwater on the piles and the safety of the foundation pit was revealed using numerical modelling. This study provides a new idea for the design and construction of tunnel engineering, especially for extra-long underwater tunnels in soft deposits.http://dx.doi.org/10.1155/2021/6184411
spellingShingle Jian Wu
Zhifang Zhou
Wenjun Xia
Haixiao Wang
Zhongqiang Fang
A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils
Advances in Civil Engineering
title A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils
title_full A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils
title_fullStr A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils
title_full_unstemmed A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils
title_short A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils
title_sort novel excavation and construction method for an extra long underwater tunnel in soft soils
url http://dx.doi.org/10.1155/2021/6184411
work_keys_str_mv AT jianwu anovelexcavationandconstructionmethodforanextralongunderwatertunnelinsoftsoils
AT zhifangzhou anovelexcavationandconstructionmethodforanextralongunderwatertunnelinsoftsoils
AT wenjunxia anovelexcavationandconstructionmethodforanextralongunderwatertunnelinsoftsoils
AT haixiaowang anovelexcavationandconstructionmethodforanextralongunderwatertunnelinsoftsoils
AT zhongqiangfang anovelexcavationandconstructionmethodforanextralongunderwatertunnelinsoftsoils
AT jianwu novelexcavationandconstructionmethodforanextralongunderwatertunnelinsoftsoils
AT zhifangzhou novelexcavationandconstructionmethodforanextralongunderwatertunnelinsoftsoils
AT wenjunxia novelexcavationandconstructionmethodforanextralongunderwatertunnelinsoftsoils
AT haixiaowang novelexcavationandconstructionmethodforanextralongunderwatertunnelinsoftsoils
AT zhongqiangfang novelexcavationandconstructionmethodforanextralongunderwatertunnelinsoftsoils