Independent energy storage planning model considering comprehensive benefits enhancement
New power systems with large-scale clean energy access require energy storage to provide critical support. Aiming at the problems of unclear service scope, high investment cost, long payback period, and low utilization rate faced by the construction of new energy storage, an energy storage planning...
Saved in:
Main Authors: | , , , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
AIP Publishing LLC
2025-01-01
|
Series: | AIP Advances |
Online Access: | http://dx.doi.org/10.1063/5.0235387 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832542746954432512 |
---|---|
author | Wenzhang Guo Yuanke Zhou Rui Zhang Han Su Jia Tian Xudong Hu Yuming Shen Jiayin Xu Feiao Zhao Yinghao Ma |
author_facet | Wenzhang Guo Yuanke Zhou Rui Zhang Han Su Jia Tian Xudong Hu Yuming Shen Jiayin Xu Feiao Zhao Yinghao Ma |
author_sort | Wenzhang Guo |
collection | DOAJ |
description | New power systems with large-scale clean energy access require energy storage to provide critical support. Aiming at the problems of unclear service scope, high investment cost, long payback period, and low utilization rate faced by the construction of new energy storage, an energy storage planning method considering the comprehensive benefits of independent energy storage is proposed. First, the key transmission sections identification index is proposed by comprehensively considering the characteristics of the key transmission sections, the grid topology, the reliability, and the criticality of the line. Second, the connecting areas of the key transmission sections are selected as the location of independent energy storage configuration and dynamically updated year by year to clarify the optimal siting area of the independent energy storage in the long term planning. Then, an independent energy storage planning model considering comprehensive benefits enhancement is established to expand the multiple applications of energy storage in the power market and improve the comprehensive benefits of the energy storage system. Finally, the improved IEEE RTS-79 system is used for simulation to verify the effectiveness of the proposed method. |
format | Article |
id | doaj-art-c4ad8d5a95eb4e5dbd0a1daac3066666 |
institution | Kabale University |
issn | 2158-3226 |
language | English |
publishDate | 2025-01-01 |
publisher | AIP Publishing LLC |
record_format | Article |
series | AIP Advances |
spelling | doaj-art-c4ad8d5a95eb4e5dbd0a1daac30666662025-02-03T16:40:42ZengAIP Publishing LLCAIP Advances2158-32262025-01-01151015210015210-1310.1063/5.0235387Independent energy storage planning model considering comprehensive benefits enhancementWenzhang Guo0Yuanke Zhou1Rui Zhang2Han Su3Jia Tian4Xudong Hu5Yuming Shen6Jiayin Xu7Feiao Zhao8Yinghao Ma9State Grid Anhui Electric Power Co., Ltd., Hefei 230022, ChinaState Grid Anhui Electric Power Co., Ltd., Hefei 230022, ChinaState Grid Anhui Electric Power Co., Ltd., Hefei 230022, ChinaState Grid Anhui Electric Power Co., Ltd., Hefei 230022, ChinaState Grid Anhui Electric Power Co., Ltd., Hefei 230022, ChinaState Grid Anhui Electric Power Co., Ltd., Hefei 230022, ChinaEconomic and Technology Research Institute of State Grid Anhui Electric Power Co., Ltd., Hefei 230022, ChinaEconomic and Technology Research Institute of State Grid Anhui Electric Power Co., Ltd., Hefei 230022, ChinaSchool of Electrical and Automation Engineering, Hefei University of Technology, Hefei 230009, ChinaSchool of Electrical and Automation Engineering, Hefei University of Technology, Hefei 230009, ChinaNew power systems with large-scale clean energy access require energy storage to provide critical support. Aiming at the problems of unclear service scope, high investment cost, long payback period, and low utilization rate faced by the construction of new energy storage, an energy storage planning method considering the comprehensive benefits of independent energy storage is proposed. First, the key transmission sections identification index is proposed by comprehensively considering the characteristics of the key transmission sections, the grid topology, the reliability, and the criticality of the line. Second, the connecting areas of the key transmission sections are selected as the location of independent energy storage configuration and dynamically updated year by year to clarify the optimal siting area of the independent energy storage in the long term planning. Then, an independent energy storage planning model considering comprehensive benefits enhancement is established to expand the multiple applications of energy storage in the power market and improve the comprehensive benefits of the energy storage system. Finally, the improved IEEE RTS-79 system is used for simulation to verify the effectiveness of the proposed method.http://dx.doi.org/10.1063/5.0235387 |
spellingShingle | Wenzhang Guo Yuanke Zhou Rui Zhang Han Su Jia Tian Xudong Hu Yuming Shen Jiayin Xu Feiao Zhao Yinghao Ma Independent energy storage planning model considering comprehensive benefits enhancement AIP Advances |
title | Independent energy storage planning model considering comprehensive benefits enhancement |
title_full | Independent energy storage planning model considering comprehensive benefits enhancement |
title_fullStr | Independent energy storage planning model considering comprehensive benefits enhancement |
title_full_unstemmed | Independent energy storage planning model considering comprehensive benefits enhancement |
title_short | Independent energy storage planning model considering comprehensive benefits enhancement |
title_sort | independent energy storage planning model considering comprehensive benefits enhancement |
url | http://dx.doi.org/10.1063/5.0235387 |
work_keys_str_mv | AT wenzhangguo independentenergystorageplanningmodelconsideringcomprehensivebenefitsenhancement AT yuankezhou independentenergystorageplanningmodelconsideringcomprehensivebenefitsenhancement AT ruizhang independentenergystorageplanningmodelconsideringcomprehensivebenefitsenhancement AT hansu independentenergystorageplanningmodelconsideringcomprehensivebenefitsenhancement AT jiatian independentenergystorageplanningmodelconsideringcomprehensivebenefitsenhancement AT xudonghu independentenergystorageplanningmodelconsideringcomprehensivebenefitsenhancement AT yumingshen independentenergystorageplanningmodelconsideringcomprehensivebenefitsenhancement AT jiayinxu independentenergystorageplanningmodelconsideringcomprehensivebenefitsenhancement AT feiaozhao independentenergystorageplanningmodelconsideringcomprehensivebenefitsenhancement AT yinghaoma independentenergystorageplanningmodelconsideringcomprehensivebenefitsenhancement |