Cost risk assessment for renovating old neighborhood of EPC projects in China using SEM-BNT-MEEM method
The transformation of old neighborhood is a significant livelihood project for urban renewal, and promoting the profound transformation of old neighborhood is a significant problem faced by China, while the Engineering Procurement Construction(EPC) model integrates the design, procurement, and const...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Polish Academy of Sciences
2025-06-01
|
| Series: | Archives of Civil Engineering |
| Subjects: | |
| Online Access: | https://journals.pan.pl/Content/135376/PDF/24_2k.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1850103748495409152 |
|---|---|
| author | Zhang Yinghui Li Tian |
| author_facet | Zhang Yinghui Li Tian |
| author_sort | Zhang Yinghui |
| collection | DOAJ |
| description | The transformation of old neighborhood is a significant livelihood project for urban renewal, and promoting the profound transformation of old neighborhood is a significant problem faced by China, while the Engineering Procurement Construction(EPC) model integrates the design, procurement, and construction of the transformation project of old neighborhood, which improves the efficiency and quality of the transformation at the same time, and faces a significant cost risk problem due to the change of fixed lump-sum price contract, so in order to enhance the ability of the general contractor to prevent the cost risk and to improve the transformation project benefits, this study constructs a comprehensive evaluation index system consisting of 19 factors to assess the cost risk in all aspects from environment, technology, management, and economy, which proposes a new type of evaluation method combining structural equation modeling (SEM), blind number theory (BNT), and matter-element extension model (MEEM), and combines with the actual cases of old neighborhood remodeling to arrive at the risk level of the factors and based on the results of the analysis are given to confirm the validity of the model and provides a successful risk assessment tool. |
| format | Article |
| id | doaj-art-c474b5373855403f9dbff967e14152dc |
| institution | DOAJ |
| issn | 1230-2945 |
| language | English |
| publishDate | 2025-06-01 |
| publisher | Polish Academy of Sciences |
| record_format | Article |
| series | Archives of Civil Engineering |
| spelling | doaj-art-c474b5373855403f9dbff967e14152dc2025-08-20T02:39:28ZengPolish Academy of SciencesArchives of Civil Engineering1230-29452025-06-01vol. 71No 2377392https://doi.org/10.24425/ace.2025.154127Cost risk assessment for renovating old neighborhood of EPC projects in China using SEM-BNT-MEEM methodZhang Yinghui0https://orcid.org/0000-0002-0923-2030Li Tian1https://orcid.org/0009-0007-3544-8277Changsha University of Science and Technology, School of Transportation and Traffic Engineering, No.960, Section 2, Wanjiali South Road, Tianxin District, Changsha, Hunan ProvinceChangsha University of Science and Technology, School of Transportation and Traffic Engineering, No.960, Section 2, Wanjiali South Road, Tianxin District, Changsha, Hunan ProvinceThe transformation of old neighborhood is a significant livelihood project for urban renewal, and promoting the profound transformation of old neighborhood is a significant problem faced by China, while the Engineering Procurement Construction(EPC) model integrates the design, procurement, and construction of the transformation project of old neighborhood, which improves the efficiency and quality of the transformation at the same time, and faces a significant cost risk problem due to the change of fixed lump-sum price contract, so in order to enhance the ability of the general contractor to prevent the cost risk and to improve the transformation project benefits, this study constructs a comprehensive evaluation index system consisting of 19 factors to assess the cost risk in all aspects from environment, technology, management, and economy, which proposes a new type of evaluation method combining structural equation modeling (SEM), blind number theory (BNT), and matter-element extension model (MEEM), and combines with the actual cases of old neighborhood remodeling to arrive at the risk level of the factors and based on the results of the analysis are given to confirm the validity of the model and provides a successful risk assessment tool.https://journals.pan.pl/Content/135376/PDF/24_2k.pdfrenovation of old neighborhoodepc projectcost risk assessmentgeneral contractorsem-bnt-meem model |
| spellingShingle | Zhang Yinghui Li Tian Cost risk assessment for renovating old neighborhood of EPC projects in China using SEM-BNT-MEEM method Archives of Civil Engineering renovation of old neighborhood epc project cost risk assessment general contractor sem-bnt-meem model |
| title | Cost risk assessment for renovating old neighborhood of EPC projects in China using SEM-BNT-MEEM method |
| title_full | Cost risk assessment for renovating old neighborhood of EPC projects in China using SEM-BNT-MEEM method |
| title_fullStr | Cost risk assessment for renovating old neighborhood of EPC projects in China using SEM-BNT-MEEM method |
| title_full_unstemmed | Cost risk assessment for renovating old neighborhood of EPC projects in China using SEM-BNT-MEEM method |
| title_short | Cost risk assessment for renovating old neighborhood of EPC projects in China using SEM-BNT-MEEM method |
| title_sort | cost risk assessment for renovating old neighborhood of epc projects in china using sem bnt meem method |
| topic | renovation of old neighborhood epc project cost risk assessment general contractor sem-bnt-meem model |
| url | https://journals.pan.pl/Content/135376/PDF/24_2k.pdf |
| work_keys_str_mv | AT zhangyinghui costriskassessmentforrenovatingoldneighborhoodofepcprojectsinchinausingsembntmeemmethod AT litian costriskassessmentforrenovatingoldneighborhoodofepcprojectsinchinausingsembntmeemmethod |