CONVERSION OF HEATING BOILER HOUSES IN MINI-THERMAL POWER STATIONS. Part 2
The results of feasibility study are given in respect of heat generating plant (co-generating plant) capacity selection on the basis of Gas-Piston Unit for a specific heating boiler house of UE «Minskkommyteploset» in the paper.Keeping in mind the current situation at the power supply market in theR...
Saved in:
Main Authors: | V. A. Sednin, A. V. Sednin, A. A. Shimoukovich |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2005-12-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/991 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization of Boiler Heat Load in Water-Heating Boiler-House
by: B. A. Bayrashevsky, et al.
Published: (2009-04-01) -
Technical and Economic Efficiency of ТРБ-Turbine Application for Utilization of Steam Potential Lost due to Throttling at Industrial and Heating Boiler-Houses and Thermal Power Stations
by: A. K. Balabanovich, et al.
Published: (2004-08-01) -
Energy Efficiency of Using Hybrid Heating Points in Conditions of Integration of Electrical and Thermal Networks of Urban Neighborhoods. Part 1. Justification of the Feasibility of Using Hybrid Thermal Points
by: A. V. Sednin, et al.
Published: (2023-12-01) -
Assessment of the Efficiency of Thermal Waste Regeneration in the Blown Impassable Channels of Heating Mains
by: V. A. Sednin, et al.
Published: (2023-02-01) -
Updating Variants Pertaining to Small Capacity Power-and-Heat Supply Sources in the Republic of Belarus
by: A. V. Sednin, et al.
Published: (2007-10-01)