CONVERSION OF HEATING BOILER HOUSES IN MINI-THERMAL POWER STATIONS. Part 2

The results of feasibility study are given in respect of heat generating plant (co-generating plant) capacity selection on the basis of Gas-Piston Unit for a specific heating boiler house of UE «Minskkommyteploset» in the paper.Keeping in mind the current situation at the power supply market in theR...

Full description

Saved in:
Bibliographic Details
Main Authors: V. A. Sednin, A. V. Sednin, A. A. Shimoukovich
Format: Article
Language:Russian
Published: Belarusian National Technical University 2005-12-01
Series:Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
Online Access:https://energy.bntu.by/jour/article/view/991
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The results of feasibility study are given in respect of heat generating plant (co-generating plant) capacity selection on the basis of Gas-Piston Unit for a specific heating boiler house of UE «Minskkommyteploset» in the paper.Keeping in mind the current situation at the power supply market in theRepublicofBelarusthe most profitable for heat supply enterprises are the variants with application of plants having heating capacity that corresponds to the base load of Hot Water Supply system or having electric power that covers boiler house auxiliaries.
ISSN:1029-7448
2414-0341