Safety Monitoring for Concrete-faced Rockfill Dam of Tianshengqiao Ⅰ Project
Saved in:
| Main Authors: | DU Ru-xin, JIANG Jian |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2000-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47675360&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Long-Term Settlement of High Concrete-Face Rockfill Dam by Field Monitoring and Numerical Simulation
by: Xinjie Zhou, et al.
Published: (2020-01-01) -
Calculation Methods for the Permeability Coefficient of Concrete Face Rockfill Dam with Cracks
by: Zhongwen Shi, et al.
Published: (2019-01-01) -
Controlled Blasting Test in Quarrying for Concrete Faced Rockfill Dam of Dahe Reservoir
by: 马忠旭
Published: (2003-01-01) -
Safety Evaluation of High Concrete-Faced Rockfill Dam Based on Site-Related Response Spectrum Using Scenario Earthquake
by: Kai-bin Zhu, et al.
Published: (2020-01-01) -
Seepage Safety of a Rockfill-based Earth Dam Heightening Project
by: CEN Wei-jun, ZHENG Xiao-yu, DENG Cheng-fa, CAO Yi-fan
Published: (2025-06-01)