JR East aims for driverless Shinkansen operation

East Japan Railway Company (JR East) is aiming to “realize driverless train operation” as one of the key measures to respond to rapid changes in the business environment. Currently, Automatic Train Operation (ATO) equipment is not installed on the Shinkansen, but there are plans to introduce ATO or...

Full description

Saved in:
Bibliographic Details
Main Author: Yasuaki Suzuki
Format: Article
Language:English
Published: KeAi Communications Co., Ltd. 2024-09-01
Series:High-Speed Railway
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2949867824000564
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850194382847737856
author Yasuaki Suzuki
author_facet Yasuaki Suzuki
author_sort Yasuaki Suzuki
collection DOAJ
description East Japan Railway Company (JR East) is aiming to “realize driverless train operation” as one of the key measures to respond to rapid changes in the business environment. Currently, Automatic Train Operation (ATO) equipment is not installed on the Shinkansen, but there are plans to introduce ATO or driverless operation in the near future. From 2018–2021, the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) held the “ATO Technology Study Group for Railways” in which the concept of technical requirements necessary for driverless operation was discussed. In 2021, JR East conducted the GOA4 demonstration test on the Joetsu Shinkansen. In this test, we were able to confirm the basic functions of Shinkansen vehicles such as automatic departure control, speed control, fixed position stop control, and remote stop control using ATO. We aim to realize unattended operation (GOA4) for deadhead trains between Niigata Station and the Niigata Shinkansen Rolling Stock Center by the end of the 2020 s, and driverless operation (GOA3) for passenger trains of the Joetsu Shinkansen by the mid-2030s and continue to develop the necessary technologies and build systems.
format Article
id doaj-art-bdd42a2abc3143e7b1156d6ec0385ff9
institution OA Journals
issn 2949-8678
language English
publishDate 2024-09-01
publisher KeAi Communications Co., Ltd.
record_format Article
series High-Speed Railway
spelling doaj-art-bdd42a2abc3143e7b1156d6ec0385ff92025-08-20T02:14:01ZengKeAi Communications Co., Ltd.High-Speed Railway2949-86782024-09-012319720110.1016/j.hspr.2024.08.003JR East aims for driverless Shinkansen operationYasuaki Suzuki0Corresponding author.; Mobility Service Department, Railway Business Headquarters, East Japan Railway Company, Shibuya-ku, Tokyo 151-8578, JapanEast Japan Railway Company (JR East) is aiming to “realize driverless train operation” as one of the key measures to respond to rapid changes in the business environment. Currently, Automatic Train Operation (ATO) equipment is not installed on the Shinkansen, but there are plans to introduce ATO or driverless operation in the near future. From 2018–2021, the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) held the “ATO Technology Study Group for Railways” in which the concept of technical requirements necessary for driverless operation was discussed. In 2021, JR East conducted the GOA4 demonstration test on the Joetsu Shinkansen. In this test, we were able to confirm the basic functions of Shinkansen vehicles such as automatic departure control, speed control, fixed position stop control, and remote stop control using ATO. We aim to realize unattended operation (GOA4) for deadhead trains between Niigata Station and the Niigata Shinkansen Rolling Stock Center by the end of the 2020 s, and driverless operation (GOA3) for passenger trains of the Joetsu Shinkansen by the mid-2030s and continue to develop the necessary technologies and build systems.http://www.sciencedirect.com/science/article/pii/S2949867824000564High-speed railwayShinkansenATOAutomatic train operationGOA3Driverless operation
spellingShingle Yasuaki Suzuki
JR East aims for driverless Shinkansen operation
High-Speed Railway
High-speed railway
Shinkansen
ATO
Automatic train operation
GOA3
Driverless operation
title JR East aims for driverless Shinkansen operation
title_full JR East aims for driverless Shinkansen operation
title_fullStr JR East aims for driverless Shinkansen operation
title_full_unstemmed JR East aims for driverless Shinkansen operation
title_short JR East aims for driverless Shinkansen operation
title_sort jr east aims for driverless shinkansen operation
topic High-speed railway
Shinkansen
ATO
Automatic train operation
GOA3
Driverless operation
url http://www.sciencedirect.com/science/article/pii/S2949867824000564
work_keys_str_mv AT yasuakisuzuki jreastaimsfordriverlessshinkansenoperation