Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China
Saved in:
| Main Author: | |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2023-01-01
|
| Series: | International Transactions on Electrical Energy Systems |
| Online Access: | http://dx.doi.org/10.1155/2023/9791037 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1849684082543296512 |
|---|---|
| author | International Transactions on Electrical Energy Systems |
| author_facet | International Transactions on Electrical Energy Systems |
| author_sort | International Transactions on Electrical Energy Systems |
| collection | DOAJ |
| format | Article |
| id | doaj-art-bda8eb1d5d0d48898c45ccf00217c66e |
| institution | DOAJ |
| issn | 2050-7038 |
| language | English |
| publishDate | 2023-01-01 |
| publisher | Wiley |
| record_format | Article |
| series | International Transactions on Electrical Energy Systems |
| spelling | doaj-art-bda8eb1d5d0d48898c45ccf00217c66e2025-08-20T03:23:34ZengWileyInternational Transactions on Electrical Energy Systems2050-70382023-01-01202310.1155/2023/9791037Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, ChinaInternational Transactions on Electrical Energy Systemshttp://dx.doi.org/10.1155/2023/9791037 |
| spellingShingle | International Transactions on Electrical Energy Systems Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China International Transactions on Electrical Energy Systems |
| title | Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China |
| title_full | Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China |
| title_fullStr | Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China |
| title_full_unstemmed | Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China |
| title_short | Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China |
| title_sort | retracted model predicted control system for the real time operation of an urban drainage system to mitigate urban flood risk a case study in the liede river catchment guangzhou china |
| url | http://dx.doi.org/10.1155/2023/9791037 |
| work_keys_str_mv | AT internationaltransactionsonelectricalenergysystems retractedmodelpredictedcontrolsystemfortherealtimeoperationofanurbandrainagesystemtomitigateurbanfloodriskacasestudyintheliederivercatchmentguangzhouchina |