Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China

Saved in:
Bibliographic Details
Main Author: International Transactions on Electrical Energy Systems
Format: Article
Language:English
Published: Wiley 2023-01-01
Series:International Transactions on Electrical Energy Systems
Online Access:http://dx.doi.org/10.1155/2023/9791037
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849684082543296512
author International Transactions on Electrical Energy Systems
author_facet International Transactions on Electrical Energy Systems
author_sort International Transactions on Electrical Energy Systems
collection DOAJ
format Article
id doaj-art-bda8eb1d5d0d48898c45ccf00217c66e
institution DOAJ
issn 2050-7038
language English
publishDate 2023-01-01
publisher Wiley
record_format Article
series International Transactions on Electrical Energy Systems
spelling doaj-art-bda8eb1d5d0d48898c45ccf00217c66e2025-08-20T03:23:34ZengWileyInternational Transactions on Electrical Energy Systems2050-70382023-01-01202310.1155/2023/9791037Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, ChinaInternational Transactions on Electrical Energy Systemshttp://dx.doi.org/10.1155/2023/9791037
spellingShingle International Transactions on Electrical Energy Systems
Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China
International Transactions on Electrical Energy Systems
title Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China
title_full Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China
title_fullStr Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China
title_full_unstemmed Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China
title_short Retracted: Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China
title_sort retracted model predicted control system for the real time operation of an urban drainage system to mitigate urban flood risk a case study in the liede river catchment guangzhou china
url http://dx.doi.org/10.1155/2023/9791037
work_keys_str_mv AT internationaltransactionsonelectricalenergysystems retractedmodelpredictedcontrolsystemfortherealtimeoperationofanurbandrainagesystemtomitigateurbanfloodriskacasestudyintheliederivercatchmentguangzhouchina