MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation
In the real manufacturing environment, the machining stage of the jobs and the assembly stage of the products are often completed in different workshops. In addition, automatic guided vehicle (AGV) plays an indispensable role in the transportation of jobs from machining workshop to assembly workshop...
Saved in:
Main Authors: | Shiming Yang, Leilei Meng, Saif Ullah, Biao Zhang, Hongyan Sang, Peng Duan |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2025-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/10856114/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Preference learning based deep reinforcement learning for flexible job shop scheduling problem
by: Xinning Liu, et al.
Published: (2025-01-01) -
AC Optimal Power Flow: a Conic Programming relaxation and an iterative MILP scheme for Global Optimization
by: Oustry, Antoine
Published: (2022-11-01) -
Algoritmo genético para reducir el makespan en un flow shop híbrido flexible con máquinas paralelas no relacionadas y tiempos de alistamiento dependientes de la secuencia
by: Juan Camilo López-Vargas, et al.
Published: (2015-01-01) -
An Analysis of the Hierarchy of Goals that Guides the Consumer’s Decision to Attend Shopping Malls: a Contrast Between Men and Women
by: Silvana Taschek Hastreiter, et al.
Published: (2016-01-01) -
The analysis of machine scheduling problem algorithm
by: Julius Simonavičius, et al.
Published: (2023-09-01)