APA (7th ed.) Citation

Yang, S., Meng, L., Ullah, S., Zhang, B., Sang, H., & Duan, P. MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation. IEEE.

Chicago Style (17th ed.) Citation

Yang, Shiming, Leilei Meng, Saif Ullah, Biao Zhang, Hongyan Sang, and Peng Duan. MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation. IEEE.

MLA (9th ed.) Citation

Yang, Shiming, et al. MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation. IEEE.

Warning: These citations may not always be 100% accurate.