Long span post-tensioned box girder bridge in Bratislava

The paper describes an analysis and detailed design of the 470 m long D4 motorway bridge in the Slovak capital Bratislava. This bridge is a part of 2 932.50 m long D4 motorway crossing of the Danube River and its surrounding areas. The 210 m long main span of the post-tensioned three span box girder...

Full description

Saved in:
Bibliographic Details
Main Authors: Adrián Chalupec, Martin Ondroš, Petr Novotný
Format: Article
Language:English
Published: Czech Technical University in Prague 2022-03-01
Series:Acta Polytechnica CTU Proceedings
Subjects:
Online Access:https://ojs.cvut.cz/ojs/index.php/APP/article/view/8002
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The paper describes an analysis and detailed design of the 470 m long D4 motorway bridge in the Slovak capital Bratislava. This bridge is a part of 2 932.50 m long D4 motorway crossing of the Danube River and its surrounding areas. The 210 m long main span of the post-tensioned three span box girder bridge is the longest span which has ever been built in Slovakia. The Ministry of Transportation and Construction of the Slovak Republic requirement was to cross all future rowing tracks by a single span. The depth of the cross section varies from 4.39 m at span to 13.09 m at piers. 35 m wide cross section carries 4-lane carriageway, median, sidewalk and cycling path. The central part of carriageway is built by the balanced cantilever method. The overhangs carrying outer lanes are built by wing traveller machine and supported by the precast struts. The bridge is currently under construction as a part of PPP project of Bratislava ring road (the motorway D4 Bratislava, Jarovce - Bratislava, Ivanka north section).
ISSN:2336-5382