Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures
[Objective] At present, there are phenomena such as long running intervals, low train load rate, and poor operating economy during weekday morning rush hours of Beijing Metro Line 16. Therefore, it is necessary to analyze the effect of its current operation plan and study improvement measures from t...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2025-04-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.013.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1850040270105608192 |
|---|---|
| author | LIU Xuepeng GONG Zhenchong YANG Yuhang |
| author_facet | LIU Xuepeng GONG Zhenchong YANG Yuhang |
| author_sort | LIU Xuepeng |
| collection | DOAJ |
| description | [Objective] At present, there are phenomena such as long running intervals, low train load rate, and poor operating economy during weekday morning rush hours of Beijing Metro Line 16. Therefore, it is necessary to analyze the effect of its current operation plan and study improvement measures from the perspective of cost reduction and efficiency improvement. [Method] The current station passenger on and off numbers and cross-section passenger volume distribution of Line 16 during weekday morning rush hours are analyzed, passenger flow characteristics in this scenario are studied. Then, based on the requirements of relevant standards and specifications, the train load rate, passenger service, train configuration rate, and precise matching of capacity and volume during weekday morning rush hours of Line 16 are analyzed, and the effect of the current operation plan is obtained. [Result & Conclusion] Problems of low passenger service level, non-compliance with standards requirements, and transportation capacity underutilization in the current morning rush hour operation plan of Line 16 need to be solved through measures such as promoting the construction of abandoned projects, adjusting operation schedules, reporting to government regulatory departments, publishing train timetables, and studying flexible formations, to ensure operating cost reduction while maintaining passenger service levels. |
| format | Article |
| id | doaj-art-bae404ccd4a3436099609843bb207c6d |
| institution | DOAJ |
| issn | 1007-869X |
| language | zho |
| publishDate | 2025-04-01 |
| publisher | Urban Mass Transit Magazine Press |
| record_format | Article |
| series | Chengshi guidao jiaotong yanjiu |
| spelling | doaj-art-bae404ccd4a3436099609843bb207c6d2025-08-20T02:56:08ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2025-04-01284677010.16037/j.1007-869x.2025.04.013Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement MeasuresLIU Xuepeng0GONG Zhenchong1YANG Yuhang2Beijing Metro Network Administration Co, Ltd, 100101, Beijing, ChinaBeijing Metro Network Administration Co, Ltd, 100101, Beijing, ChinaBeijing Metro Network Administration Co, Ltd, 100101, Beijing, China[Objective] At present, there are phenomena such as long running intervals, low train load rate, and poor operating economy during weekday morning rush hours of Beijing Metro Line 16. Therefore, it is necessary to analyze the effect of its current operation plan and study improvement measures from the perspective of cost reduction and efficiency improvement. [Method] The current station passenger on and off numbers and cross-section passenger volume distribution of Line 16 during weekday morning rush hours are analyzed, passenger flow characteristics in this scenario are studied. Then, based on the requirements of relevant standards and specifications, the train load rate, passenger service, train configuration rate, and precise matching of capacity and volume during weekday morning rush hours of Line 16 are analyzed, and the effect of the current operation plan is obtained. [Result & Conclusion] Problems of low passenger service level, non-compliance with standards requirements, and transportation capacity underutilization in the current morning rush hour operation plan of Line 16 need to be solved through measures such as promoting the construction of abandoned projects, adjusting operation schedules, reporting to government regulatory departments, publishing train timetables, and studying flexible formations, to ensure operating cost reduction while maintaining passenger service levels.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.013.htmlurban rail transitanalysis of passenger flow characteristicseffect of operation plan |
| spellingShingle | LIU Xuepeng GONG Zhenchong YANG Yuhang Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures Chengshi guidao jiaotong yanjiu urban rail transit analysis of passenger flow characteristics effect of operation plan |
| title | Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures |
| title_full | Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures |
| title_fullStr | Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures |
| title_full_unstemmed | Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures |
| title_short | Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures |
| title_sort | research on the effect of beijing metro line 16 operation plan and improvement measures |
| topic | urban rail transit analysis of passenger flow characteristics effect of operation plan |
| url | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.013.html |
| work_keys_str_mv | AT liuxuepeng researchontheeffectofbeijingmetroline16operationplanandimprovementmeasures AT gongzhenchong researchontheeffectofbeijingmetroline16operationplanandimprovementmeasures AT yangyuhang researchontheeffectofbeijingmetroline16operationplanandimprovementmeasures |