Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures

[Objective] At present, there are phenomena such as long running intervals, low train load rate, and poor operating economy during weekday morning rush hours of Beijing Metro Line 16. Therefore, it is necessary to analyze the effect of its current operation plan and study improvement measures from t...

Full description

Saved in:
Bibliographic Details
Main Authors: LIU Xuepeng, GONG Zhenchong, YANG Yuhang
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2025-04-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.013.html
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850040270105608192
author LIU Xuepeng
GONG Zhenchong
YANG Yuhang
author_facet LIU Xuepeng
GONG Zhenchong
YANG Yuhang
author_sort LIU Xuepeng
collection DOAJ
description [Objective] At present, there are phenomena such as long running intervals, low train load rate, and poor operating economy during weekday morning rush hours of Beijing Metro Line 16. Therefore, it is necessary to analyze the effect of its current operation plan and study improvement measures from the perspective of cost reduction and efficiency improvement. [Method] The current station passenger on and off numbers and cross-section passenger volume distribution of Line 16 during weekday morning rush hours are analyzed, passenger flow characteristics in this scenario are studied. Then, based on the requirements of relevant standards and specifications, the train load rate, passenger service, train configuration rate, and precise matching of capacity and volume during weekday morning rush hours of Line 16 are analyzed, and the effect of the current operation plan is obtained. [Result & Conclusion] Problems of low passenger service level, non-compliance with standards requirements, and transportation capacity underutilization in the current morning rush hour operation plan of Line 16 need to be solved through measures such as promoting the construction of abandoned projects, adjusting operation schedules, reporting to government regulatory departments, publishing train timetables, and studying flexible formations, to ensure operating cost reduction while maintaining passenger service levels.
format Article
id doaj-art-bae404ccd4a3436099609843bb207c6d
institution DOAJ
issn 1007-869X
language zho
publishDate 2025-04-01
publisher Urban Mass Transit Magazine Press
record_format Article
series Chengshi guidao jiaotong yanjiu
spelling doaj-art-bae404ccd4a3436099609843bb207c6d2025-08-20T02:56:08ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2025-04-01284677010.16037/j.1007-869x.2025.04.013Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement MeasuresLIU Xuepeng0GONG Zhenchong1YANG Yuhang2Beijing Metro Network Administration Co, Ltd, 100101, Beijing, ChinaBeijing Metro Network Administration Co, Ltd, 100101, Beijing, ChinaBeijing Metro Network Administration Co, Ltd, 100101, Beijing, China[Objective] At present, there are phenomena such as long running intervals, low train load rate, and poor operating economy during weekday morning rush hours of Beijing Metro Line 16. Therefore, it is necessary to analyze the effect of its current operation plan and study improvement measures from the perspective of cost reduction and efficiency improvement. [Method] The current station passenger on and off numbers and cross-section passenger volume distribution of Line 16 during weekday morning rush hours are analyzed, passenger flow characteristics in this scenario are studied. Then, based on the requirements of relevant standards and specifications, the train load rate, passenger service, train configuration rate, and precise matching of capacity and volume during weekday morning rush hours of Line 16 are analyzed, and the effect of the current operation plan is obtained. [Result & Conclusion] Problems of low passenger service level, non-compliance with standards requirements, and transportation capacity underutilization in the current morning rush hour operation plan of Line 16 need to be solved through measures such as promoting the construction of abandoned projects, adjusting operation schedules, reporting to government regulatory departments, publishing train timetables, and studying flexible formations, to ensure operating cost reduction while maintaining passenger service levels.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.013.htmlurban rail transitanalysis of passenger flow characteristicseffect of operation plan
spellingShingle LIU Xuepeng
GONG Zhenchong
YANG Yuhang
Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures
Chengshi guidao jiaotong yanjiu
urban rail transit
analysis of passenger flow characteristics
effect of operation plan
title Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures
title_full Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures
title_fullStr Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures
title_full_unstemmed Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures
title_short Research on the Effect of Beijing Metro Line 16 Operation Plan and Improvement Measures
title_sort research on the effect of beijing metro line 16 operation plan and improvement measures
topic urban rail transit
analysis of passenger flow characteristics
effect of operation plan
url https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.013.html
work_keys_str_mv AT liuxuepeng researchontheeffectofbeijingmetroline16operationplanandimprovementmeasures
AT gongzhenchong researchontheeffectofbeijingmetroline16operationplanandimprovementmeasures
AT yangyuhang researchontheeffectofbeijingmetroline16operationplanandimprovementmeasures