An Efficient Model for Train-Track-Bridge-Coupled System under Seismic Excitation

When an earthquake occurs, due to the high operation speed of the train group, there is still a long distance from braking to stopping, so it needs a large number of bridge spans to calculate the integrated dynamic response, which leads to a large amount of calculation of the train-track-bridge (TTB...

Full description

Saved in:
Bibliographic Details
Main Authors: Lizhong Jiang, Tuo Zhou, Xiang Liu, Ping Xiang, Yuntai Zhang
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Shock and Vibration
Online Access:http://dx.doi.org/10.1155/2021/9924507
Tags: Add Tag
No Tags, Be the first to tag this record!