Experimental Study on the Calibration of Microparameters of Dolomite in the Barun Open-Pit Mine on the Basis of the Parallel Bond Model
The microparameter calibration of the particle flow parallel bond model (PBM) is mostly based on a uniaxial compression test. The microparameters calibrated only by uniaxial compression tests cannot be directly used to study the mechanical properties of rocks with surrounding pressure conditions. To...
Saved in:
| Main Authors: | Zhiheng Dang, Zuoming Yin, Desheng Wang, Mingyu Fu, Qi Yin |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2021-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2021/1267536 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization and Application of Spacing Parameter for Loosening Blasting with 24-m-High Bench in Barun Open-Pit Mine
by: Zuoming Yin, et al.
Published: (2021-01-01) -
Calibrating the microparameters of DEM models using the ant colony optimization algorithm and the optimal hyperparameters
by: Pingyang Fan, et al.
Published: (2025-05-01) -
Research on Calibration Algorithm of Camera and LiDAR for Transport Vehicles in Open-pit Mines
by: XU Yanghan, et al.
Published: (2022-12-01) -
Geomechanical Basis for Assessing Open-Pit Slope Stability in High-Altitude Gold Mining
by: Farit Nizametdinov, et al.
Published: (2025-07-01) -
Research Progress and Typical Case of Open-Pit to Underground Mining in China
by: Shuai Li, et al.
Published: (2025-07-01)