Testing of equipment for removing reinforced concrete pile caps
Introduction. The article discusses the requirements for equipment for removing pile caps of reinforced concrete piles. The machines produced nowadays have excessive power and strength parameters which has been noted and proved experimentally.Materials and methods. Using a prototype of operational e...
Saved in:
| Main Authors: | D. V. Furmanov, N. N. Klochko, T. A. Krasnobaev |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
Siberian State Automobile and Highway University
2024-03-01
|
| Series: | Вестник СибАДИ |
| Subjects: | |
| Online Access: | https://vestnik.sibadi.org/jour/article/view/1766 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Effect of column and pile configuration and dimension on shear performance of reinforced concrete pile caps
by: Sabry Fayed, et al.
Published: (2025-06-01) -
Investigation of new confined concrete-filled aluminum tube piles: Experimental and numerical approaches
by: Fadhil Al-Darraji, et al.
Published: (2024-12-01) -
Effect of Pile Spacing on Load Bearing Performance of NT-CEP Pile Group Foundation
by: Yongmei Qian, et al.
Published: (2025-04-01) -
Pile Integrity Testing Using Non-Destructive Testing Techniques and Artificial Intelligence: A Review
by: Peiyun Qiu, et al.
Published: (2025-08-01) -
A steel joint for driven precast concrete geothermal energy pile foundations
by: Habibollah Sadeghi, et al.
Published: (2024-01-01)