Testing of equipment for removing reinforced concrete pile caps

Introduction. The article discusses the requirements for equipment for removing pile caps of reinforced concrete piles. The machines produced nowadays have excessive power and strength parameters which has been noted and proved experimentally.Materials and methods. Using a prototype of operational e...

Full description

Saved in:
Bibliographic Details
Main Authors: D. V. Furmanov, N. N. Klochko, T. A. Krasnobaev
Format: Article
Language:Russian
Published: Siberian State Automobile and Highway University 2024-03-01
Series:Вестник СибАДИ
Subjects:
Online Access:https://vestnik.sibadi.org/jour/article/view/1766
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850030048951664640
author D. V. Furmanov
N. N. Klochko
T. A. Krasnobaev
author_facet D. V. Furmanov
N. N. Klochko
T. A. Krasnobaev
author_sort D. V. Furmanov
collection DOAJ
description Introduction. The article discusses the requirements for equipment for removing pile caps of reinforced concrete piles. The machines produced nowadays have excessive power and strength parameters which has been noted and proved experimentally.Materials and methods. Using a prototype of operational equipment on the different piles of different cross-section the force parameters of the working process, the character of development of cutting resistance forces in the cycle were investigated.Results. The stick-slip nature of cutting resistance forces and then a sharp drop of these forces on the whole area of theoscillogram indicates the brittle character of the pile fracture. It is also noted that the dependence of head shearing resistance forces on the height of the pile cap is linear. Technological and constructive features of the new equipment were investigated. High productivity of the machine as a whole was shown.Discussion and conclusion. Based on the results of the tests, the authors concluded that further work on the study of the working process of removal of reinforced concrete pile caps is reasonable.
format Article
id doaj-art-b68d317c0a4b4e69ac2d639274eaf5f4
institution DOAJ
issn 2071-7296
2658-5626
language Russian
publishDate 2024-03-01
publisher Siberian State Automobile and Highway University
record_format Article
series Вестник СибАДИ
spelling doaj-art-b68d317c0a4b4e69ac2d639274eaf5f42025-08-20T02:59:20ZrusSiberian State Automobile and Highway UniversityВестник СибАДИ2071-72962658-56262024-03-01211384610.26518/2071-7296-2024-21-1-38-46845Testing of equipment for removing reinforced concrete pile capsD. V. Furmanov0N. N. Klochko1T. A. Krasnobaev2Yaroslavl State Technical University (YSTU)Yaroslavl State Technical University (YSTU)Yaroslavl State Technical University (YSTU)Introduction. The article discusses the requirements for equipment for removing pile caps of reinforced concrete piles. The machines produced nowadays have excessive power and strength parameters which has been noted and proved experimentally.Materials and methods. Using a prototype of operational equipment on the different piles of different cross-section the force parameters of the working process, the character of development of cutting resistance forces in the cycle were investigated.Results. The stick-slip nature of cutting resistance forces and then a sharp drop of these forces on the whole area of theoscillogram indicates the brittle character of the pile fracture. It is also noted that the dependence of head shearing resistance forces on the height of the pile cap is linear. Technological and constructive features of the new equipment were investigated. High productivity of the machine as a whole was shown.Discussion and conclusion. Based on the results of the tests, the authors concluded that further work on the study of the working process of removal of reinforced concrete pile caps is reasonable.https://vestnik.sibadi.org/jour/article/view/1766concreteconcrete destructionpilepile head cuttingpile head cutting equipment
spellingShingle D. V. Furmanov
N. N. Klochko
T. A. Krasnobaev
Testing of equipment for removing reinforced concrete pile caps
Вестник СибАДИ
concrete
concrete destruction
pile
pile head cutting
pile head cutting equipment
title Testing of equipment for removing reinforced concrete pile caps
title_full Testing of equipment for removing reinforced concrete pile caps
title_fullStr Testing of equipment for removing reinforced concrete pile caps
title_full_unstemmed Testing of equipment for removing reinforced concrete pile caps
title_short Testing of equipment for removing reinforced concrete pile caps
title_sort testing of equipment for removing reinforced concrete pile caps
topic concrete
concrete destruction
pile
pile head cutting
pile head cutting equipment
url https://vestnik.sibadi.org/jour/article/view/1766
work_keys_str_mv AT dvfurmanov testingofequipmentforremovingreinforcedconcretepilecaps
AT nnklochko testingofequipmentforremovingreinforcedconcretepilecaps
AT takrasnobaev testingofequipmentforremovingreinforcedconcretepilecaps