STUDY OF A NEW METHOD FOR THE REMAINING LIFE PREDICTION OF CORROSION PIPELINE

For the reliability problems of large data samples and low prediction accuracy and statistics to predict the remaining life of the corrosion pipelines,the author proposed the gray prediction theory to predict the residual life of corrosion pipelines; For the problem of unable to do with non-isochron...

Full description

Saved in:
Bibliographic Details
Main Authors: JIANG Feng, ZHENG YunHu
Format: Article
Language:zho
Published: Editorial Office of Journal of Mechanical Strength 2015-01-01
Series:Jixie qiangdu
Subjects:
Online Access:http://www.jxqd.net.cn/thesisDetails#10.16579/j.issn.1001.9669.2015.03.010
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841534569020391424
author JIANG Feng
ZHENG YunHu
author_facet JIANG Feng
ZHENG YunHu
author_sort JIANG Feng
collection DOAJ
description For the reliability problems of large data samples and low prediction accuracy and statistics to predict the remaining life of the corrosion pipelines,the author proposed the gray prediction theory to predict the residual life of corrosion pipelines; For the problem of unable to do with non-isochronous data、larger errors in the process of background values construction and had not used new information fully of the traditional GM( 1,1) model,the author optimized the traditional GM( 1,1) model and the model is improved. It’sby using the constructed residual life prediction model of the corrosion pipelines and the optimized GM( 1,1) model to calculate the remaining life of the corrosion pipelines that is the accuracy,accuracy,simple,feasible and pervasive method.
format Article
id doaj-art-b63f7f639a914ec5b3f6edc3333d6284
institution Kabale University
issn 1001-9669
language zho
publishDate 2015-01-01
publisher Editorial Office of Journal of Mechanical Strength
record_format Article
series Jixie qiangdu
spelling doaj-art-b63f7f639a914ec5b3f6edc3333d62842025-01-15T02:38:36ZzhoEditorial Office of Journal of Mechanical StrengthJixie qiangdu1001-96692015-01-013753954530591884STUDY OF A NEW METHOD FOR THE REMAINING LIFE PREDICTION OF CORROSION PIPELINEJIANG FengZHENG YunHuFor the reliability problems of large data samples and low prediction accuracy and statistics to predict the remaining life of the corrosion pipelines,the author proposed the gray prediction theory to predict the residual life of corrosion pipelines; For the problem of unable to do with non-isochronous data、larger errors in the process of background values construction and had not used new information fully of the traditional GM( 1,1) model,the author optimized the traditional GM( 1,1) model and the model is improved. It’sby using the constructed residual life prediction model of the corrosion pipelines and the optimized GM( 1,1) model to calculate the remaining life of the corrosion pipelines that is the accuracy,accuracy,simple,feasible and pervasive method.http://www.jxqd.net.cn/thesisDetails#10.16579/j.issn.1001.9669.2015.03.010PipeForecastingCorrosionGM(1,1)Development factorResidual life
spellingShingle JIANG Feng
ZHENG YunHu
STUDY OF A NEW METHOD FOR THE REMAINING LIFE PREDICTION OF CORROSION PIPELINE
Jixie qiangdu
Pipe
Forecasting
Corrosion
GM(1,1)
Development factor
Residual life
title STUDY OF A NEW METHOD FOR THE REMAINING LIFE PREDICTION OF CORROSION PIPELINE
title_full STUDY OF A NEW METHOD FOR THE REMAINING LIFE PREDICTION OF CORROSION PIPELINE
title_fullStr STUDY OF A NEW METHOD FOR THE REMAINING LIFE PREDICTION OF CORROSION PIPELINE
title_full_unstemmed STUDY OF A NEW METHOD FOR THE REMAINING LIFE PREDICTION OF CORROSION PIPELINE
title_short STUDY OF A NEW METHOD FOR THE REMAINING LIFE PREDICTION OF CORROSION PIPELINE
title_sort study of a new method for the remaining life prediction of corrosion pipeline
topic Pipe
Forecasting
Corrosion
GM(1,1)
Development factor
Residual life
url http://www.jxqd.net.cn/thesisDetails#10.16579/j.issn.1001.9669.2015.03.010
work_keys_str_mv AT jiangfeng studyofanewmethodfortheremaininglifepredictionofcorrosionpipeline
AT zhengyunhu studyofanewmethodfortheremaininglifepredictionofcorrosionpipeline