A study on chloronitrobenzene manufacture wastewater treatment with sequential anaerobic-aerobic process

The performances and mechanism of Fe/C reduction-A/O process for the treatment of chloronitrobenzenes manufacture wastewater were studied in this paper. The results showed that main pollutants in effluent from integrated process were up to the second standard of GB8978-96 at influent COD 1241-1608 m...

Full description

Saved in:
Bibliographic Details
Main Authors: YE Min, XU Xiang-yang, XIE Yu-sheng
Format: Article
Language:English
Published: Zhejiang University Press 2003-03-01
Series:浙江大学学报. 农业与生命科学版
Subjects:
Online Access:https://www.academax.com/doi/10.3785/1008-9209.2003.02.0201
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The performances and mechanism of Fe/C reduction-A/O process for the treatment of chloronitrobenzenes manufacture wastewater were studied in this paper. The results showed that main pollutants in effluent from integrated process were up to the second standard of GB8978-96 at influent COD 1241-1608 mg/L, nitrobenzene 52.0-69.2 mg/L, aniline 161.1-260.2 mg/L, when HRT was set up to be 1 h in Fe/C reduction unit, 10-12 h / 36-48 h in the anoxic / anaerobic biological reactors, respectively, and addition of 0.5-2‰ FeCl<sub>3</sub> as the post-treatment agent. The GC-MS analytical results indicated the typical toxic organic pollutants, such as chloronitrobenzene, chloroaniline, and aniline were transformed and decomposed in this integrated process, mechanism of organics transformation and degradation by Fe/C or microorganism was also suggested.
ISSN:1008-9209
2097-5155